background image

MPB

MNK-S, MNK-SB, SCK-S

 

emptying waste-water basins

Emptying with overflow

A - Filling

B - Venting

A volume of liquid in the suc-
tion line permits self-priming
with a peripheral pump.

Application example for a liquid
similar to water, 20°C. Venting
time approx. 5 minutes.

As shown in the diagram, no
additional valves are required if
it is always ensured that the
pump is not siphoned after it is
switched off. It is siphoned
when the discharge line
remains open after the pump is
switched off and the medium
column on the discharge side
can flow back through the
pump. Here, too much medium
is entrained out of the pump
housing and so the pump can
no longer be primed when
started up again! The

siphoning of the pump

 can

be prevented if, after the end
of conveyance, the shut-off
valve on the discharge side is
closed first and then the pump
switched off. It is recom-
mended to switch off the pump
before air enters the suction
line, i.e. the suction line end
should always lie at the low
level of the medium.

As the diagram shows, no
additional valves are required
for the pump for emptying with
overflow. The sequence of
activation of the shut-off valve
and the start-up of the pump is
arbitrary for the 

start-up and

shutdown operations.

.

2.5.5.4 

Supply lines

Supply lines should vent towards the reservoir and are therefore to be laid with a constant down-
ward gradient towards the pump. Should the piping internals upstream of the pump be horizontal, a
low point can, of course, be located upstream of these internals. From here the pipe is then laid
with an upward gradient to the pump so that the gas bubbles which form here can escape through
the pump. Valves which disrupt the course of flow should not be installed directly upstream of the
pump.

Safety and installation instructions for Richter pumps

Richter Pumpen / 

pumps

Installation > Piping

21

Содержание MNK

Страница 1: ...lheiten enthalten unsere Einbau und Betriebsanleitungen Further information is given in our installation and operating manuals http www richter ct com Richter Pumpen pumps Vor Beginn aller Arbeiten An...

Страница 2: ...Richter Pumpen pumps 2...

Страница 3: ...b 12 1 5 7 Kupplung 13 1 5 8 Endkontrolle 13 1 5 9 Kupplungsschutz 13 1 5 10 Elektrischer Anschluss 14 2 Safety and installation instructions for Richter pumps 15 2 1 Symbols in the manual 15 2 2 Dang...

Страница 4: ...2 5 11 Anzugsmomente Tightening torques 24 3 Index 30 Inhaltsverzeichnis Richter Pumpen pumps 4...

Страница 5: ...htet besteht erh hte Explosionsge fahr und schwere oder t dliche Verletzungen k nnen die Folge sein Sind Personen mit Herzschrittmacher z B durch ein starkes Magnetfeld gef hrdet sind diese Symbole ei...

Страница 6: ...rden Die Bedingungen am Einsatzort m ssen den Angaben im Datenblatt entspre chen Pumpen sind Komponenten zum Einbau in Maschinen im Sinne der RICHTLINIE 2006 42 EG Die Inbetriebnahme ist solange unter...

Страница 7: ...n Zeichnung wird dann wieder montiert HINWEIS Es ist empfehlenswert einen Str mungsw chter in die Sp lleitung einzubauen Bei Unterschreitung der Mindestsp lmenge l st dieser dann Alarm oder das Abscha...

Страница 8: ...emeinsamer Grundplatte geliefert und ausgerichtet sind Vor Beginn des Ausrichtens St tzfu l sen und danach spannungsfrei anziehen Die Pumpe mit Hilfe einer Wasserwaage an Welle Druckstutzen in alle Ri...

Страница 9: ...sind die Schrauben Anzugsmomente in zu beachten 1 5 5 1 Nennweite Der Betriebspunkt einer Kreiselpumpe liegt im Schnittpunkt der Pumpenkennlinie und der Rohrlei tungskennlinie Abb 1 Die Pumpenkennlini...

Страница 10: ...nn gem ISO 5199 MNKA RMA RSA ANSI HI 9 6 2 stutzenbelastet werden Siehe auch TIS 0541 02 006 Temperaturbedingte L ngen nderungen der Rohrleitung sind durch geeignete Ma nahmen z B durch Einbau von Kom...

Страница 11: ...ei wird zuviel Medium aus dem Pumpenge h use mitgerissen so dass die Pumpe bei erneutem Anfahren nicht mehr ansaugen kann Das Leerhebern der Pumpe kann vermieden werden wenn nach Beendigung der F rde...

Страница 12: ...genutzt werden Bohrschablone siehe Kapitel Montagehilfen in der Betriebsanleitung 1 5 6 Antrieb Die Leistungsaufnahme der Pumpe im Betriebspunkt ist im Datenblatt bzw Werks Attest ange geben Ist der B...

Страница 13: ...und 2 ist eine Kupplung mit g ltiger ATEX Zulassung zu verwenden Vorschriften bestehen z B f r folgende Einzelheiten Anordnung der Kupplungsh lften max Bohrungsdurchmesser max bertragbare Leistung Abs...

Страница 14: ...orhan dene Netzspannung mit den Angaben auf dem Typenschild des Motors vergleichen und geeignete Schaltung w hlen Eine Motorschutzeinrichtung Motorschutzschalter ist dringend zu empfehlen GEFAHR Bei u...

Страница 15: ...is an increased risk of explosion and serious injury or death may result Are people with a pacemaker for example threatened by a strong magnetic field these symbols are inserted HINWEIS Safety symbol...

Страница 16: ...ns in this operationg manual marked with Ex The conditions at the site of operation have to correspond to all data sheet data Pumps are com ponents to install in machines according to machine directiv...

Страница 17: ...wing provided HINWEIS It is recommended to install a flow monitor in the flushing line If the minimum flushing flow is undershot this sensor then triggers an alarm or the motor is shut off Self primin...

Страница 18: ...otor are sup plied on a common base plate and aligned Prior to alignment undo the support bracket and then tighten it without stress The pump is to be aligned in all directions using a spirit level on...

Страница 19: ...apter 2 5 11 Anzugsmomente Tightening torques on page 24 are to be observed for tightening the flange screws 2 5 5 1 Nom size The operating design point of a centrifugal pump lies at the intersection...

Страница 20: ...cordance with ISO 5199 MNKA RMA RSA ANSI HI 9 6 2 See also TIS 0541 02 006 Changes in the length of the piping caused by tempera ture are to be allowed for by appropriate measures e g the installation...

Страница 21: ...then the pump switched off It is recom mended to switch off the pump before air enters the suction line i e the suction line end should always lie at the low level of the medium As the diagram shows...

Страница 22: ...spective mechanical seal and a safety margin are to be considered Magnetic drive pumps Care must be taken when selecting the motor size to ensure that the excess power is not too great but that the re...

Страница 23: ...s required 2 5 8 Final check Check alignment of the coupling according to Chapter 2 5 3 Alignment of pump coupling motor standard version on page 18 again It must be possible to easily turn the unit a...

Страница 24: ...lation If the pump is mounted on a base plate ensuring electrical conduction through the use of a chopper disk or contact disk on the housing foot and support bracket The assembly must be grounded in...

Страница 25: ...B RSI Gr e Size Anzahl x Gr e No x size Anzugsmoment Tightening torque PN 16 PN 20 mm DIN ISO Nm 40 25 125 50 32 125 8 x M 12 28 33 40 25 160 50 32 160 80 50 160 8 x M 12 40 47 50 32 200 65 40 200 80...

Страница 26: ...3 x 1 5 x 6 3 x 2 x 6 8 x 47 415 1 5 x 1 x 8 10 x 44 390 3 x 1 5 x 8 3 x2 x8 4 x3 x8 12 x 47 415 3 x 2 x 10 12 x 84 743 MPB Teile Parts Anzahl x Gr e No x size Anzugsmoment Tightening torque PN 16 DIN...

Страница 27: ...chrauben Blind cover stud screws 8 x M 10 20 Rohrleitungsschrauben Flansche nach DIN EN 1092 2 ISO 7005 2 Form B Pipe screws flanges to ISO 7005 2 Form B DIN EN 1092 2 MNK MNK B MPB SCK DN Anzahl x Gr...

Страница 28: ...gsmoment Tightening torque PN 16 PN 25 PN 16 PN 25 mm DIN ISO Nm 150 8 x M 20 8 x M 24 65 100 200 12 x M 20 12 x M 24 100 115 Rohrleitungsschrauben Flansche nach ASME B16 5 Class 150 Pipe screws flang...

Страница 29: ...B MPB SCK DN Anzahl x Gr e No x size Anzugsmoment Tightening torque mm inch ASME Nm in lbs 25 1 4 x 8 70 32 1 4 x 12 105 40 1 4 x 15 135 50 2 4 x 25 220 65 2 4 x 30 265 80 3 4 x 45 400 100 4 8 x 35 3...

Страница 30: ...n 24 Elektrischer Anschluss 14 Endkontrolle 13 Entleerung 12 Entl ftung 12 F Final check 23 G Gefahr 6 I Installation 16 Pump unit 17 Intended use 16 K Kennlinie Pumpe 9 Rohrleitung 9 Kupplung 13 Kupp...

Страница 31: ...2 Entl ftung 12 Nennweite 9 Saugleitung 10 Stutzenbelastung 10 Zulaufleitung 12 S Saugleitung 10 Storage 16 Stutzenbelastung 10 Suction line 20 Supply lines 21 T Tightening torques 24 Body screws 24 T...

Страница 32: ...319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Internet www richter inc com Richter Pumps Valves Pvt Ltd Suntech Centre 37 40 Subhash Road Vile Parle East Mumbai 400057 Ind...

Отзывы: