background image

Series MNK pedestal group 4 

Page 

14

 

 

 

9230-003-en 

Revision 19 

TM  10458

 

Edition 06/2022 

Commissioning / Shutdown

6.1  Initial commissioning 

Normally,  the  pumps  have  already  been  test-run  with 
water.  Unless  special  agreements  have  been  made, 
there  could  still  be  residual  amounts  of  water  in  the 
pump. This must be noted in view of a possible reaction 
with the medium. 

Long life grease lubrication: 

The rolling bearings are greased for life. Regreasing is 
not possible and not necessary. For service lives, see 

Section 7.2

 

Oil bath lubrication: 

Pour in oil into the bearing pedestal! 

For procedure and the oil grade, see 

Sections 7.2 and 

7.8.5

 

6.1.1  Filling the pump housing 

  Check  to  see  whether  the  screws  on  the  suction 

flange,  discharge  flange,  housing  flange  and  drain 
flange are tightened.  

When retightening  the  housing screws, make sure 
that the support  bracket is undone. Otherwise, the 
pump could be deformed.  

For screw tightening torques see 

Section 1.1

  Open the suction line fully so that the medium can 

flow into the pump. 

  Open the discharge valve so that the air in the pump 

can escape. 

  If air cannot be vented into the discharge line, e.g. a 

drop in pressure in this line is not permitted, venting 
must be performed upstream of the discharge valve. 

  Monitor  the  venting  operation  until  no  air  but  only 

liquid emerges. 

  Turn the pump shaft at the coupling several times. 

  Monitor the venting operation again until no more air 

emerges. 

  Close  the  discharge  valve  again  until 

only the minimum flow rate is obtained 
after the motor has been started. 

 

 

 

6.1.2  Start-up 

  Check  to  see  whether  the  pump  shaft 

can be readily turned by hand. 

 

  Check the direction of rotation of the motor with the 

coupling  disengaged  or  with  a  rotary  field  instru-
ment. 

  As viewed from the motor, the direction of rotation 

of the pump is clockwise. See also the direction of 
rotation arrow of the pump. 

 

The  pump  must  not  run  dry  during  the 
check of the direction of rotation.

 

  Check alignment of the coupling. 

  Mount coupling guard. 

 

The  pump  must  be  completely  filled  with 
liquid. The maximum admissible flow rate 
must not be exceeded. 

 

 

Otherwise  the plain bearings can run dry 
in both cases. 

  Switch the motor on. 

Set the desired flow by opening the discharge valve. 

 

When the motor is running but the pump is 
not  conveying,  this  means  that  the  mag-
netic drive has stopped. 

  Switch  motor  off  immediately  in  order  to  prevent 

overheating of the magnet assemblies. 

Then proceeded as follows: 

  Close  discharge  valve  down  to  the  position  "mini-

mum flow rate" 

  Start motor again. 

If the magnetic drive stops again, look for the cause. 

6.2  Operating limits 

 

The  operating  limits  of  the  pump/unit  in 
terms  of  pressure,  temperature,  power 
and  speed  are  entered  in  the  data  sheet 
and it is imperative to observe them! 

 

6.2.1  Abrasive media 

 

If  liquids  with  abrasive  constituents  are 
conveyed,  increased  wear  at  the  pump  is 
to  be  expected.  The  inspection  intervals 
are to be reduced compared with the usual 
times. 

 

Содержание MNK Series

Страница 1: ...transport installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9230 003 en Revision 19...

Страница 2: ...14 6 1 Initial commissioning 14 6 1 1 Filling the pump housing 14 6 1 2 Start up 14 6 2 Operating limits 14 6 2 1 Abrasive media 14 6 2 2 Min max flow rate 15 6 3 Shutdown 15 6 4 Restarting 15 6 5 Im...

Страница 3: ...t Str 2 D 47906 Kempen Telephone 49 0 2152 146 0 Fax 49 0 2152 146 190 E Mail richter info idexcorp com Internet http www richter ct com Authorised person acc to machinery directive 2006 42 EG Gregor...

Страница 4: ...illed to ASME 150 lbs DN No x size Tightening torque mm inch ASME Nm in lbs 100 4 8 x 35 310 125 5 8 x 55 485 150 6 8 x 80 710 200 8 8 x 115 1020 1 2 Type plate dry running ATEX and housing markings T...

Страница 5: ...s used in potentially explosive areas special attention is to be paid to the sections identified with Ex in this operating manual 2 1 Intended use Richter pumps of the series MNK 200 150 315 is a plas...

Страница 6: ...so Sec tion 5 1 and 7 5 2 are observed the magnetic drives do not cause any risks or have any affect on the envi ronment It is imperative to observe the notes on safety in Section 7 5 2 during disman...

Страница 7: ...on For assembling the pump with components which are not explosion protected e g motor shaft coupling it is recommended to mask or remove the potentially explosive identification from the pump compone...

Страница 8: ...ature of the pumped liquid exceeds 180 C the ATEX approval becomes permanently invalid The ATEX plate must be removed immediately by the operator A new ATEX approval can only be issued by a judge For...

Страница 9: ...ssi ble Elastomers are to be protected against UV light Generally a storage period of 10 years does not ex ceeded An admissible storage period of 4 years ap plies to elastomers made of NBR If magnetic...

Страница 10: ...vented and evacuated through the bores in the plain bearing pedestal Additional information is provided in the brochure 5 Installation 5 1 Safety regulations Equipment which is operated in potentially...

Страница 11: ...he NPSHR required for the pump Otherwise this will lead to a drop in the delivery head cavita tion or even failure of the pump 5 4 2 Nozzle loads The pump can be subjected to nozzle loads acc to DIN E...

Страница 12: ...mp at the operating point is specified in the data sheet or factory certificate If the operating point is not known when the pump is delivered the power requirement can be taken from the corresponding...

Страница 13: ...or fulfills the impact resistance test required by DIN EN ISO 80079 36 without any problem It must be ensured that the coupling guard used is ei ther made of spark free material or the impact test re...

Страница 14: ...tor the venting operation again until no more air emerges Close the discharge valve again until only the minimum flow rate is obtained after the motor has been started 6 1 2 Start up Check to see whet...

Страница 15: ...brief periods may result in serious damage to the unit In connection with explosion protection potential sources of ignition overheating electrostatic and induced charges mechanical and electric spark...

Страница 16: ...bearings 7 2 2 Oil bath lubrication With an expected bearing temperature of about 70 C we recommend a mineral oil with the following charac teristics Viscosity index approx 85 Kinematic viscosity at...

Страница 17: ...urer Hold magnetic drives as single parts firmly or secure Otherwise they could be attracted for example by a vice Risk of accident People with an artificial pacemaker Keep torso at a minimum distance...

Страница 18: ...tight design it is not possible to sep arate the can insert as it and the can are glued to gether 7 6 2 Dismantling drive unit Long life grease lubrication Remove the cylinder screw 914 5 with toothe...

Страница 19: ...roller bearings 321 1 and 321 2 on the drive shaft 213 Push drive shaft unit into the bearing pedestal 330 mount wavy spring washer 953 1 and rear bearing cover 361 and tighten all components with the...

Страница 20: ...ger thread of the drive shaft 213 with two drops of Loctite 638 green provide the shaft basis fit on both sides with FDA approved fat for example Rivolta F L G GT 2 and screw it into the impeller 230...

Страница 21: ...3 leg chain sling and make sure that the square fits in the plain bear ing bush 545 x As threadlocking provide the thread of the pump shaft 211 with Loctite 243 blue Provide the shaft thread with 1 d...

Страница 22: ...tern chamber using the flat pivot point of the threaded rods and an open jaw wrench size 13 The threaded rods must be turned evenly and alternately Caution Magnetic forces Risk of accident Remove thre...

Страница 23: ...insert it into the holder If the oil level still drops too far add oil to the plastic container again Fig 6 7 9 Tests The pumps are tested with water at the manufacturer s The operating data measured...

Страница 24: ...SHR too high Are the pipe resistances too high Is the viscosity too high Is the direction of rotation correct Is the speed too low or the impeller diameter too small Are pump parts worn Gas in the med...

Страница 25: ...Series MNK pedestal group 4 Page 25 9230 003 en Revision 19 TM 10458 Edition 06 2022 9 Exploded drawing 9 1 Long life grease lubrication...

Страница 26: ...Series MNK pedestal group 4 Page 26 9230 003 en Revision 19 TM 10458 Edition 06 2022 9 2 Oil bath lubrication...

Страница 27: ...404 Bearing pedestal gasket 412 x o ring 415 1 centering gasket 509 1 intermediate ring 523 x shaft sleeve 529 x bearing sleeve 545 x bearing bush 552 3 tightening washer 554 x washer 557 2 contact di...

Страница 28: ...Series MNK pedestal group 4 Page 28 9230 003 en Revision 19 TM 10458 Edition 06 2022 10 2 Sectional drawing long life grease lubrication X Y and Z see pump work certificate...

Страница 29: ...Series MNK pedestal group 4 Page 29 9230 003 en Revision 19 TM 10458 Edition 06 2022 10 3 Sectional drawing oil bath lubrication X Y and Z see pump work certificate...

Страница 30: ...radially This creates a friction connection between the device and the plain bearing bush which does not damage the material The bearing bush can now be removed by hitting the handle centre axially R...

Страница 31: ...rsal impeller wrench To unscrew the impeller we recommend the use of the universal impeller wrench This tool can be used for all impeller diameters from 230 mm to 350 mm The tool consists of a heavy d...

Страница 32: ...mbH Baureihe Series Serie Ausf hrung Magnetkupplungspumpe MNK Design Magnet drive pump Group 4 Einsatzgrenzen operating limits 1 Baugr e size MNK 200 150 315 MNK 125 100 315 1 3 2 3 1 Angelehnt an Fla...

Страница 33: ...rding to A395 class150 the standard range can be increased to 30 C and 16 bar Standard PN25 version When used under ASME conditions ductile cast iron according to A395 class300 the standard range can...

Страница 34: ......

Страница 35: ......

Страница 36: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 37: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 38: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 39: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: