Maintenance
Safety valves must be checked for
operability at regular intervals according to
the national regulations (in Germany: UVV -
pressure vessels, VBG 17 § 32 and TRD
601 sheet 2, paragraph 3.4).
♦
The intervals for regular checks are to be laid
down by the customer in line with the operating
conditions.
♦
The lifting lever
238
allows the valves to be
actuated from outside, they then open at the
operating pressure available. For lifting, the pres-
sure is to be at least 85% of the test pressure.
♦
All repair work is to be performed by qualified
personnel using the appropriate tools.
♦
For the arrangement, designation and item
numbers of all parts of the valve, see
Section 10
.
♦
Spare parts are to be ordered with all the details in
acc. with the valve identification.
♦
Only original spare parts may be installed.
Fig. 17
Fig.
16
9.1 Screw connections
♦
To prevent leaks, a regular check of the connec-
tion screws should be made in line with the operat-
ing requirements.
For tightening torques, see
Section 1.3
.
♦
To prevent screw connections from becoming
loose in the event of pressure fluctuations or plant
vibrations, we recommend the installation of ex-
pansion joints or pulsation dampers.
9.2 Cleaning
Prior to starting any repair work, the valve is
to be thoroughly cleaned. Even if the valve
has been properly emptied and rinsed,
residual medium may still be found in the
valve, e.g. between the lining and body or in
the bonnet.
Plastic parts may absorb medium which gradually
emerges from the material after cleaning.
Wear the prescribed protective clothing!
Safety valves which have been cleaned with water or
other media must be dried before re-assembly of the
parts and installation of the valve in the plant.
9.3 Modification of the safety
valve
If modifications to the valve are required, the
manufacturer must always be consulted.
Examples: Modification with changed test pressure,
replacement of the spring or adaption to the mass flow
by reducing the travel.
After
approval
by
the
manufacturer,
these
modifications can be performed either by the
manufacturer or by the customer under the guidance
of a technical supervisory agency or any other
approval authority.
9.4 Adjustment of the test pres-
sure
♦
Undo locking plate
539
, dismantle lifting lever
238
and unscrew the lifting cap
535
.
♦
Undo nut
920/3
.
♦
Adjust the spring tension with the adjusting screw
538
to the specified test pressure.
♦
Counter adjusting screw
538
with a hex. thin nut
920/3
resp. with centering nut
555
(DN 25/50).
♦
Check test pressure.
Содержание KSE 100/150
Страница 24: ...Series KSE F KSE C F Page 24 9530 001 en Revision 19 TM 9549 Edition 11 2018 10 2 Sectional drawing KSE F...
Страница 28: ......
Страница 29: ......
Страница 30: ......