Series KN/F, KNP/F, KN-D/F, KNP-D/F
Page
14
9520-050-en
Revision 18
TM 9818
Edition 11/2018
9.4.1 Packing bellows
♦
Press thrust ring
405/1
into packing bellows
403
.
♦
Install retaining washer
526
. (not in DN 150 and
200/150)
♦
Press unit into main body
101
.
♦
Press in grounding spring washer
557
.
9.4.2 Ball valve with lever
♦
Mount lever stop
577
, spring gland follower
502
(in
DN 80, 100, 150 and 200/150 are 2 spring gland
followers
502
) and packing gland follower
503
.
Tighten packing nuts until there is no gap between
packing gland follower and spring gland follower.
See
Section 1.3
and
10.4
.
♦
Seal any tapped bores still open with plugs.
♦
Mount lever
203
.
9.4.3 Ball valve with actuator
♦
Mount spring gland follower
502
(in DN 80, 100,
150 and 200/150 are 2 spring gland followers
502
)
and packing gland follower
503
. Tighten packing
nuts until there is no gap between packing gland
follower
503
and spring gland follower
502
. See
Section 1.3
and
10.5
.
♦
Mount bracket
510
with the opening at right angles
to the direction of flow.
♦
Mount coupling
804
and actuator
850
. Observe the
actuator position in accordance with the actuator
operating manual.
♦
Make sure that the position of the ball valve with
ball and stem, and the position of the actuator are
aligned.
9.5 Conversion from lever to
actuator
♦
Select the actuator in accordance with the
instructions of the actuator manufacturer.
♦
Remove lever
203
.
♦
Remove lever stop
577
and the plug.
♦
Check the fits of the coupling
804
, bracket
510
and
actuator
850
.
♦
Mount bracket
510
with the opening at right angles
to the direction of flow.
♦
Mount coupling
804
and actuator
850
. Observe the
actuator position in accordance with the actuator
operating manual.
♦
Connecting dimensions see drawing 9520-00-
4018.