background image

Series KA-N/F, KAP-N/F 

Page 

13

 

 
 

9520-017-en 

Revision  15 

TM 10477

 

Edition 05/2022

 

9.2.4  KAP-N/F with actuator 

  Mount actuator 

850 

with coupling 

804

  Dismantle  packing  gland  follower 

503 

and  spring 

gland follower 

502

  Remove lantern 

510

Further  dismantling  is  performed  as  described  in 

Section 9.2.1

 to 

9.2.3

 
 

9.3  Assembly KA-N/F with  

ball/stem unit 

  Prior to assembly all  parts are to  be cleaned and 

the plastic-lined parts checked for damage. 

  Insert  seat  rings 

401

  in  the  main  body 

101 

and 

body end piece 

102

  Mount ball/stem unit 

201 

in closed position. Make 

sure that you do not damage the body lining.  

  An  additional  bore  in  the  ball/stem  unit,  e.g.  for 

cavity-free, must  lie  on the p1 side  in the closed 
position.  

  Mount  body  end  piece 

102

.  Tighten  the  greased 

housing  screws  cross  over  with  a  tightening 
torque according to 

section 1.2

 
 

9.3.1  Packing bellows 

  Press thrust ring 

405/1

 into packing bellows 

403

  Install retaining washer 

526

  Press unit into main body 

101

  Press in grounding spring washer 

557

 

9.3.2  KA-N/F with lever 

  Mount  lever  stop 

577

,  spring  gland  follower 

502 

and packing gland follower 

503

. Tighten packing 

nuts until there is no gap between packing gland 
follower  and  spring  gland  follower.  See 

Section 

1.2

 and 

10.6

  Seal any tapped bores still open with plugs. 

  Mount lever 

203

 

 

9.3.3  KAP-N/F with actuator 

  Mount spring  gland follower 

502 

and packing  gland 

follower 

503

. Tighten packing nuts until there is no 

gap  between  packing  gland  follower  and  spring 
gland follower. See 

Section 1.2

 and 

10.7

  Mount  bracket 

510 

with  the  opening  at right  angles 

to  the  direction  of  flow.  See  sectional  drawing  in 

Section 10.3

  Mount  coupling 

804 

and  actuator 

850

.  Observe  the 

actuator  position  in  accordance  with  the  actuator 
operating manual. 

 
 

9.4  Assembly KA-N/F with  

ball / stem 

  Prior to assembly all parts are to be cleaned and the 

plastic-lined parts checked for damage. 

  Insert seat rings 

401

 in the main body 

101 

and body 

end piece 

102

  Insert stem 

202 

from inside into the main body 

101

  Move stem 

202 

into the 'closed' position. 

  Swivel  ball 

200 

into  the  stem 

202

.  Any  pressure 

relief  or  drain  bore  must  lie  on  the  p1  side  in  the 
"off" position. See also 

Section 6.2

  Mount  body  end  piece 

102

.  Tighten  the  greased 

housing screws cross over with a tightening torque 
according to 

section 1.2

 
 

9.4.1  Packing bellows 

  Press thrust ring 

405/1

 into packing bellows 

403

  Install retaining washer 

526

  Press unit into main body 

101

  Press in grounding spring washer 

557

 
 

9.4.2  KA-N/F with lever 

  Mount lever stop 

577

, spring gland follower 

502

 and 

packing  gland  follower 

503

.  Tighten  packing  nuts 

until there is no gap between packing gland follow-
er and spring gland follower.  See 

Section 1.2

 and 

10.6

  Seal any tapped bores still open with plugs. 

  Mount lever 

203

Содержание KA-N/F Series

Страница 1: ...llation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9520 017 en Revision 15 Edition 05 2022...

Страница 2: ...commissioning 10 7 2 Improper operation and their consequences 10 7 3 Shutdown 10 8 Malfunctions 11 9 Maintenance 12 9 1 Dismantling KA N F with ball stem unit 12 9 1 1 KA N F with lever 12 9 1 2 Pack...

Страница 3: ...l stem unit or ball stem and Richter ENVIPACK self adjusting universal stuffing box two piece housing Series KA N F Design with lever or hand gear KAP N F Design prepared for pneum hydr or elec actuat...

Страница 4: ...tion Melt number Foundry identification Foundry date 1 2 Tightening torques All screws greased tighten in diametrically opposite sequence The tightening torques for pipe screws and body screws mention...

Страница 5: ...Actuating torques ball and stem Test medium water 20 C Higher actuating torques may occur with other media DN p in bar 3 6 10 16 max admis mm Nm Nm Nm Nm Nm 50 25 12 12 12 12 28 80 50 25 30 35 50 120...

Страница 6: ...ent Directive PED for the passage and shut off of fluids The valves are suitable for vapours gases and non boiling liquids of group 1 according to the PED and have a corrosion resistant plastic lining...

Страница 7: ...of an explosive atmosphere must be prevented e g by superimposing a layer of nitrogen It is recom mended to wait 1 hour before removing the valve from the plant in order to permit the elimination of...

Страница 8: ...he goods being transported with care During transport protect the valve against impacts and collisions Directly after receipt of the goods check the consign ment for completeness and any in transit da...

Страница 9: ...metal inlay These gaskets are available as special accessories in the Richter range 6 2 Direction of flow and installa tion position Installation is independent of the direction of flow Any fitting po...

Страница 10: ...the ball stem or ball stem unit This can be prevented by heating In extreme cases this may cause blocking If the ball blocks do not apply force as the ball stem or ball stem unit may break if the max...

Страница 11: ...ction 1 2 Ball valve does not operate Is the actuator supplied with power Is any directional control valve correctly connect ed Is there foreign matter in the valve The ball no longer closes completel...

Страница 12: ...packing gland follower 503 and spring gland follower 502 Remove lantern 510 Further dismantling is performed as described in Section 9 1 1 to 9 1 2 9 2 Dismantling KA N F with ball stem It is possibl...

Страница 13: ...ugs Mount lever 203 9 3 3 KAP N F with actuator Mount spring gland follower 502 and packing gland follower 503 Tighten packing nuts until there is no gap between packing gland follower and spring glan...

Страница 14: ...ver 203 Remove lever stop 577 and plug Check the fits of the coupling 804 bracket 510 and actuator 850 Mount bracket 510 with the opening at right angles to the direction of flow Mount coupling 804 an...

Страница 15: ...Series KA N F KAP N F Page 15 9520 017 en Revision 15 TM 10477 Edition 05 2022 10 2 Sectional drawing KA N F with ball stem unit and lever Holes view displaced by 45...

Страница 16: ...Series KA N F KAP N F Page 16 9520 017 en Revision 15 TM 10477 Edition 05 2022 10 3 Sectional drawing KAP N F with ball stem unit and actuator Holes view displaced by 45...

Страница 17: ...Series KA N F KAP N F Page 17 9520 017 en Revision 15 TM 10477 Edition 05 2022 10 4 Sectional drawing KA N F with ball stem and lever Holes view displaced by 45...

Страница 18: ...Series KA N F KAP N F Page 18 9520 017 en Revision 15 TM 10477 Edition 05 2022 10 5 Sectional drawing KAP N F with ball stem and actuator Holes view displaced by 45...

Страница 19: ...Series KA N F KAP N F Page 19 9520 017 en Revision 15 TM 10477 Edition 05 2022 10 6 View and section KA N F 10 7 Sections KAP N F...

Страница 20: ...on 05 2022 10 8 Dimensional drawing KA N F DN DN1 50 25 80 50 100 50 150 100 L 160 210 210 325 H 130 155 155 195 HL 179 260 260 313 all dimensions in mm Flange connecting dimensions DIN EN 1092 2 type...

Страница 21: ...ecting dimensions to DIN ISO 5211 H3 H4 L L1 L2 L3 50 25 50 60 F05 160 80 50 80 F07 210 100 50 150 100 134 80 F10 325 all dimensions in mm Dimensions L1 L2 L3 H3 and H4 vary depending on the actuator...

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ...848 1 vom T V S d Industrie Service GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the leakage rate La s 10...

Страница 26: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 27: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 28: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 29: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: