background image

Series MNKA, 

acc. to ASME

 

Page 16

 

9250-050-en 

Revision  11 

TM 7903

 

Edition   07/2010 

7

Maintenance 

7.1  Screw connections of the 

housing (casing) 

After  initial  loading  by  the  operating  pressure  and 
operating  temperature  the  tightening  torques  of  all 
connection  screws  must  be  checked  at  the  following 
points: 

housing (casing) flange 
suction flange 
discharge flange 

See also 

Section 6.1.1, para. 1

.

7.2  Bearing pedestal 

The  temperature  of  the  bearing  pedestal  is 
not  to  exceed  more  than  122 °F  (50 °C)  and 
under no circumstances 176 °F (80 °C). 

If  higher  temperatures  do  occur,  call  in  qualified  staff 
without delay. If this is not possible, the pump must be 
shut down and taken out of service. 
In  many  cases  a  vibration  measurement  is 
recommended to detect bearing wear in good time.  
 

7.2.1  Grease for life lubrication 

Grease fill bearings of the series 2RS are installed as 
standard  features.  The  grease  is  lithium-saponified. 
The admissible temperature range is – 22 °F to 230 °F  
(– 30 °C to +  110 °C). 
The  rolling  bearings  are  designed  for  an  L

10

  service 

life  of  > 17,500  hours.  The  service  life  of  the  grease 
filling  guaranteed  by  the  bearing  manufacturers  is 
given in the following table. 

 

Size 

Bearing size > Service life 

Group 1 

6207-2RS / 15000 hr* 

Group 2 

6210-2RS / 15000 hr* 

*

at bearing temperature < 122 °F (50 °C) 

  at bearing temperature  158 °F (70 °C) approx. 7500 hr 

If  the  pump  is  serviced,  it  is  recommended  to  also 
replace the bearings as a precaution. 

In potentially explosive works it is 
advisable to monitor the condition of 
the rolling bearings. 

 

7.2.2  Oil bath lubrication 

We  recommend  a  mineral  oil  with  the  following 
characteristics for an expected bearing temperature of 
about 158 °F (70 °C): 
Viscosity index :  approx. 85 

Kinematic viscosity  at 104 °F (40 °C) 

:

s

2

mm

40

.

appr

 

A fully synthetic gear oil to ISO VG 220 is to be used 
for temperatures below – 68 °F (– 20 °C). 

Replacing  the  bearings:

The  ball  bearings  are 

designed for an L

10

 service life of >17,500 hours. 

We  recommend  17.500  working  hours  respectively 
every 3 years a change of bearing should be made. 

Oil changes:

1x per year at bearing temperatures of 

about 122 °F (50 °C). 
Every  6  months  at  bearing  temperatures  of  about 
158 °F (70 °C). 
At higher temperatures more frequently in accordance 
with the regulations. 
When  the  pump  is  serviced,  it  is  recommended  to 
replace  the  bearings  and  shaft  seals  as  a  precaution 
and to pour in fresh oil. 

Oil  level  check:

The  oil  level  is  to  be  regularly 

checked  on  the  constant  level  oiler 

638/1

  to  ensure 

safe operation. 
It  must  be  ensured  that  there  is  always  oil  in  the 
constant level oiler; it must under no circumstances be 
completely drained. 

In  potentially  explosive  works  it  is 
advisable  to  monitor  the  condition  of 
the ball bearings  

If  there  is  a  suspicion  that  splash  water  could  have 
entered the bearing pedestal, the oil must be replaced 
immediately.  Even  small  amounts  of  water  in  the  oil 
reduce the service life of the ball bearings to a fraction 
of the normal service life. 

 

7.3  Cleaning 

Care  must  be  taken  when  cleaning  the  pump  to 
ensure that it is not exposed to a strong water jet. 
The  ingress  of  water  into  the  bearing  pedestal  will 
substantially impair bearing lubrication. 

 

7.4  Stand-by pumps 

If  a  pump  is  on  stand-by,  it  is  to  be  started  up  from 
time  to  time.  Regularly  turn  the  shaft  by  hand  in  the 
direction of rotation. 
This  operation  is  to  be  performed  more  often  for 
pumps  which  are  exposed  to  very  strong  vibrations 
from the plant.  
When  dismantling  the  pump  from  the  plant,  drain  it, 
thoroughly clean it, seal  with flange covers and store 
in accordance with the instructions. 

 

Содержание ASME Series

Страница 1: ...rt installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9250 050 en Revision 11 Edition...

Страница 2: ...Coupling guard 13 5 11 Electric connection 13 6 Commissioning Shutdown 14 6 1 Initial commissioning 14 6 1 1 Filling the pump housing casing 14 6 1 2 Start up 14 6 2 Operating limits 14 6 2 1 Abrasiv...

Страница 3: ...et http www richter ct com Authorised person acc to machinery directive 2006 42 EG Gregor Kleining Designation Single stage plastic lined magnetic drive chemical centrifugal pump series MNKA long life...

Страница 4: ...ws flanges to ASME DN No x size Tightening torque inch ASME Nm in lbs 1 4 x 8 70 1 4 x 15 135 2 4 x S 25 220 3 4 x S 45 400 1 2 Name plate dry running ATEX and housing casing markings The stainless st...

Страница 5: ...e series MNKA ASME are sealless plastic lined magnetic drive centrifugal pumps for the leak free conveyance of aggressive toxic pure and inflammable liquids The pump is equipped with a permanent magne...

Страница 6: ...ring transport and storage of the magnetic drives as single components the notes on safety in Section 7 5 2 must be observed The points listed in Section 6 1 must be followed before recommissioning 2...

Страница 7: ...er 9 3 allows no temperature class or temperature to be indicated The temperature class must be determined by the operated in accordance with Section 2 6 7 Temperature limits 2 6 5 Check of the direct...

Страница 8: ...data sheet The plant customer must ensure that the prescribed operating temperature is observed The maximum admissible temperature of the liquid medium at the pump inlet depends on the temperature cl...

Страница 9: ...as possible Elastomers are to be protected against UV light In general a storage period of 10 years should not be exceeded An admissible storage period of 4 years applies to elastomers made of NBR If...

Страница 10: ...ainment shell chamber is also vented and evacuated through the bores in the plain bearing pedestal 339 Additional information is provided in the brochure and the Product manual 5 Installation 5 1 Safe...

Страница 11: ...sitive suction head must also be observed The NPSHR value required for the pump is specified in the data shee The NPSHR available in the plant should be at least 1 64 ft 0 5 m higher than the NPSHR re...

Страница 12: ...Problems on request 5 7 Drive The power consumption of the pump at the operating design point is specified in the data sheet and works certificate If the operating design point was not known when the...

Страница 13: ...t prevention regulations It must be ensured that the coupling guard used is either made of spark free material or the impact test required by the EN 13463 is satisfied without any reservations Richter...

Страница 14: ...turned by hand Check the direction of rotation of the motor with the coupling disengaged or with a rotary field instrument As viewed from the motor the direction of rotation of the pump is clockwise S...

Страница 15: ...connection with explosion protection potential sources of ignition overheating electrostatic and induced charges mechanical and electric sparks may result from these inadmissible modes of operation t...

Страница 16: ...index approx 85 Kinematic viscosity at 104 F 40 C s 2 mm 40 appr A fully synthetic gear oil to ISO VG 220 is to be used for temperatures below 68 F 20 C Replacing the bearings The ball bearings are de...

Страница 17: ...ta carriers such as credit cards cheque cards ID cards with magnetic strips or magnetic tape 6 150 mm distance 7 6 Dismantling There are 3 possibilities for dismantling 1 Remove the complete pump from...

Страница 18: ...ure that no plain bearing parts fall Silicon carbide is easy to break Use isolated gloves when handling hot bearings Failure to follow this instructions may result in property damage sever personal in...

Страница 19: ...screw 914 1 with tooth lock washer 936 1 Secure thread with a drop of Loctite for example For tightening a hex socket key with 120 mm minimum length is required Screw bearing pedestal 330 lantern 344...

Страница 20: ...ightening the housing casing screws 901 3 make sure that the support bracket 183 is firmly positioned If necessary undo support bracket align and secure again For tightening torques see Section 1 1 7...

Страница 21: ...NPSHR too high Are the pipe resistances too high Is the viscosity too high Is the direction of rotation correct Is the speed too low or the impeller diameter too small Are pump parts worn Gas in the...

Страница 22: ...61 rear bearing cover 400 1 flat gasket 401 housing gasket casing gasket 412 3 O ring 415 1 centering gasket 504 distance ring 509 1 intermediate ring 529 x bearing sleeve 545 x bearing bush 557 2 con...

Страница 23: ...Series MNKA acc to ASME Page 23 9250 050 en Revision 11 TM 7903 Edition 07 2010 9 2 MNKA with long life grease lubrication...

Страница 24: ...Series MNKA acc to ASME Page 24 9250 050 en Revision 11 TM 7903 Edition 07 2010 9 3 MNKA with oil bath lubrication...

Страница 25: ...UMPEN CHEMICAL PROCESS PUMPS POMPE POUR L INDUSTRIE CHIMIQUE Baureihe Series S rie Ausf hrung Magnetkupplungspumpe ASME insatzgrenzen Design Magnet drive pump ASME operating limits Construction Pompe...

Страница 26: ...iled by below mentioned notified body according to directive 94 9 EC Physikalische Technische Bundesanstalt PTB D 38116 Braunschweig Baureihe Series Registrier Nr Registered Baureihe Series Registrier...

Страница 27: ...Interne Fertigungskontrolle Production Quality Assurance Angewandte EN 14121 harmonisierte Normen EN 809 Applied harmonised Standards Kennzeichnung 2006 42 EG Marking Das Unternehmen Richter Chemie T...

Страница 28: ...mination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the rep...

Страница 29: ...logical 2 and with which cleaning method radioactive 3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with...

Страница 30: ...IOSTOFFV the procedures for the prevention of accidents as well as regulations to environmental protection e g the Waste Management Law AbfG and the Water Resources Act WHG An inspection repair of Ric...

Отзывы: