![Rice Lake 350-10-8S Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/rice-lake/350-10-8s/350-10-8s_technical-manual_1454100010.webp)
350-10-8S Digital Stretcher Scale
6
Visit our website
2.3 Indicator Installation
Use the following sections to setup the provided Rice Lake indicator.
2.3.1 Load Cell Connection
The indicator and scale comes factory installed with a load cell cable connection. Follow the procedure below if the load cell
cable needs to be replaced or reconnected to the indicator.
1. Unscrew and remove the tilt stand bracket from the indicator to gain access to the load cell connection.
Figure 2-7. Remove Tilt Stand
2. Remove the four back retaining screws
to
remove the back cover to the indicator.
Figure 2-8. Remove Back Cover
3. Plug the end of the load cell cable into the load cell connection. When it clicks the load cell cable is properly seated
into the connection.
Figure 2-9. Load Cell Connection Point
4. Reinstall the back cover and attach to the tilt stand.
Unscrew tilt stand
knobs and remove tilt
stand from indicator
Load Cell
Connection
Do Not Use this
Connection for
Load Cells
Содержание 350-10-8S
Страница 29: ......