Quick Start Guide www.rhosonics.com Page 1/2
Install the SDM WT
Weld weldolet onto pipe
Install wafer or spool
Tighten bolts
Drill a hole of
Ø
36 mm
Horizontal pipe installation must be at 3 or 9 o
’
clock
Unscrew the back lid to see the SDM WT
’
s rear view as shown on the picture above
Do not connect 220V to the SDM WT
Check and unpack shipment
1.
Check if the box is complete and not damaged. Inside the box:
a.
The Slurry Density Meter (SDM WT)
b.
Wafer, Spool piece or Weldolet
c.
Manual
Install the SDM WT
Follow the three installation steps shown in the picture below.
Note:
Tighten the bolts following the manual guidelines, check which bolt torque values are
needed. First mount the wafer, spool or weldolet and then the SDM WT.
Check:
Weldolet and sensor must be installed flush mounted with the surface inside the pipe.
The inner pipe diameter must be equal to the inner diameter of the wafer/spool piece
.
Vertical pipe installation only if the flow goes in upstream direction. Use the rubber
O-ring when mounting the SDM WT. This is important for proper sealing.
Make electrical connection
1.
Connect protective earth cable (see image below)
2.
Connect 24V and HART/ 4
…
20 mA
1
.
2
.
1.
2.
3.
3
.
1. 2.
We
ld
o
let
Wafer
o
r Sp
o
o
l pi
ece
CAUTION:
CAUTION:
See
ch
ap
ter
2
.1
–
2
.6
Ch
ap
te
r 2
.7
yo
u
tu
.b
e/s
WU_
fG
H
n
Y6A
yo
u
tu
.b
e/ou
Dm
d
L-
AJ
Vw