INSTALLATION
14
INSULATION - INSTALLATION INSTRUCTIONS
ALUMINIUM CLADDING
Ensure the drain is fitted or plugged. Ensure the
tank is in position where it’s going to be installed,
as it can be difficult to move once the insulation
is attached.
The insulation comes in multiple sections that will vary
both in quantity and layout depending on the size of the
tank. These sections clip together along the edges
using a tooth lock system.
Fit the two green foam insulation rings around
the upper and lower flange. Fit the two black
plastic flange covers over the foam rings.
There are 14 plastic fitting surrounds, these vary in
size and should fit tightly around the fittings. The
fitting surrounds are placed on after the panel and
should sit flush with the front of the fitting. Attach the
fitting surrounds as each panel is put in place, this will
help to hold the section in the correct position as
each panel is added.
When the first panel is in place, fit the panel to
the left using the same process. Where the
sections meet there are 5 teeth that clip
together. We recommend joining to the outside
tooth until all sections are together.
Take the section that has the two larger holes and line
them up with the flanges on the tank. The bottom of the
insulation should be touching the ground. If there are
further holes in the panel fit them over the fittings
ensuring the insulation is clear of the fittings.
Содержание ST1000C6
Страница 28: ...28 This page is intentionally blank ...
Страница 29: ...29 This page is intentionally blank ...
Страница 30: ...30 This page is intentionally blank ...