RG NDT International Inspection Research ShotChek II Скачать руководство пользователя страница 1

Model II

Current Pulse Monitor

U.S. Patent #4,502,004

Operation Manual

V2.0

165 Oates Rd, Houston, TX 77013 ~ (713) 675-5928

Содержание Inspection Research ShotChek II

Страница 1: ...Model II Current Pulse Monitor U S Patent 4 502 004 Operation Manual V2 0 165 Oates Rd Houston TX 77013 713 675 5928 ...

Страница 2: ...I I O p e r a ti o n M a n u a l V 2 0 Section Page Basic Operation 1 Operation Notes 2 Description of Rear Panel 3 Specifications 5 Servicing Calibration 6 Warranty 7 Table of Contents 165 Oates Rd Houston TX 77013 713 675 5928 ...

Страница 3: ...ince the ShotChek ll will indicate the direction of current flow as well as the magnitude it is not necessary to know the polarity of the current source and the current probe may be positioned arbitrarily with respect to direction 4 Fire the shooting system which may be either a capacitor discharge unit or battery pack and read the peak current in kiloamps on the left digital display A minus sign ...

Страница 4: ...elative position of the current probe with respect to the conductor does not affect the accuracy of the measurement Ampere s Circuital Law In other words the conductor does not have to be centered in the ID of the current probe nor does the current probe have to be perpendicular to the flow of current 5 Each ShotChek unit and current probe is calibrated as a pair Although it is possible for the di...

Страница 5: ...00 mA min can be used to charge the unit The standard charge for a completely discharged unit is 14 hours Neither benefit nor damage occurs from extended charging A standard charge will provide at least 10 hours of continuous operation Extensive usage of the LCD backlights will reduce operating time Operation of the unit during charging will increase the amount of time required for a full charge R...

Страница 6: ... ShotChek unit Using a different cable than the one used to calibrate the device may affect accuracy for best results use the same cable CAUTION Never connect anything other than the ShotChek Current Probe to the input jack otherwise the unit may be damaged and any warranty will be void Figure 2 REAR PANEL U S Patent 4 502 004 The ShotChek name and logo are registered trademarks of RG NDT Internat...

Страница 7: ...ds Repeatability 00 10 milliseconds Accuracy 3 of reading 1 digit Dimensions Current probe 2 8 ID toroid Display unit 8 x 8 1 2 x 3 Display Type Dual Liquid Crystal Displays LCD Backlighting Electroluminescent EL Polarity Minus only on peak current Other Charger 12VDC 100mA min RG NDT International Inc reserves the right to change specifications at any time without incurring any obligation to inco...

Страница 8: ...e cabinet or other disassembly of any part s of the unit will void the warranty As with all electronic instrumentation periodic calibration should be performed The recommended calibration period for the ShotChek II unit is one 1 year If servicing or calibration is required contact U S Patent 4 502 004 The ShotChek name and logo are registered trademarks of RG NDT International Inc Servicing Calibr...

Страница 9: ...ties expressed or implied RG NDT International Inc s liability shall be limited to replacement cost of its own product in question In no event and under no circumstances shall RG NDT International Inc be liable for any indirect incidental or consequential loss or damage arising from the use or failure of its equipment or from breach of this warranty No representation or other affirmation of fact i...

Отзывы: