Form I-XE/CRGB/RPB, Mfg No. 131782 Rev 4, Page 13

Optional Vertical Flue Discharge (Option CC3)

These power vented furnaces are certified with four feet (1.2M) of
vertical pipe attached as shown in 

FIGURES 11A and 11B

. The dis-

tance is measured from the top of the unit to the bottom of the vent cap.
The option package includes the 5" vent cap, the adapter assembly and
the seal plate. The vent pipe and supports are field supplied. 

The

straight pipe connecting the furnace to the 90° elbow must be at
least 18" (457mm) in length

.

Optional vertical vent piping provides compliance with local codes
that require either 10-ft (3M) horizontal or 4-ft (1.2M) vertical clear-
ance between the flue outlet and fresh air intake of the heating system
and/or the building.

FIGURE 9C - Optional Stack Extension applies only to
Furnaces with Suffix "Z" in their Model No.

Gravity Vent Cap

4 ft

(1.2M)

Three guy wires, spaced 120°

apart, fastened to the vent

cap collar and furnace top

with sheetmetal screws.

8C. Venting - Power Vented, Outdoor Models

Locate power-vented furnaces so that flue discharge is not directed at
fresh air inlets.

Flue Gas and
Combustion Air
Openings

These screened openings are lo-
cated on the side of the furnace
just above the control access
panel. See 

FIGURE 10

. The po-

sition of these openings discour-
ages recirculation of combustion
products and provides for fur-
nace operation in all normal
weather conditions.

Flue Products

Outlet

Combustion

Air Inlet

FIGURE 11A - Installation of Adapter for Optional Vertical
Flue Discharge (Option CC3, P/N 45021)

5” Vent Cap,

P/N 110052

5” dia Flue Pipe

(1.2M)

5” dia

90° Elbow

18” (457mm) Straight Pipe

Oval Adapter Assy

Combustion Air Intake

Support angles for flue pipe.

Recommended size is

 1/2”x1/2”, 20 gauge

FIGURE 11B - Installation of the Vent Cap (included in the
option package) and the field-supplied Piping and Supports

Oval Adapter Assy,

PN/ 103025

Venter Seal Plate,

P/N 43446

9. Condensate Drain

9A. Indoor Models XE/HXE

Condensate can form in the heat exchanger of furnaces installed as makeup
air units or when installed downstream from a cooling coil. Under these
conditions, a drain flange, Option CS1, may be installed on the furnace
bottom as shown in 

FIGURE 12

. When using Option CS1, seal all

corners and the four square holes in the bottom pan edge.

9B. Outdoor Model Series CRGB and RPB

A hole is provided in all four corners of the furnace bottom to drain off
condensation to the outside of the curb cap to the roof.

FIGURE 12 - Condensate Drain, Option CS1 (P/N 31765)

Bottom of the Furnace Casing

#10 x 1-1/4 Bolt and Nut

3/4” Pipe Waste Nut

Gasket

Seal holes in bottom pan. Terminate drain outside of
building. Periodic cleaning of the condensate collector and
disposal system is required.

1) Remove and discard

the louvered
discharge grill.

2) Using venter seal

plate as a template,
drill holes. Attach
venter seal plate and
oval adapter
assembly with 3/8"-
10 sheetmetal
screws.

FIGURE 10 - Flue Outlet,
Power-Vented Furnaces

10. Duct Connections

Requirements and Suggestions for Connecting
and Installing Ducts

Type of Ductwork

 - The type of duct installation to be used de-

pends in part on the type of construction of the roof (whether wood
joist, steelbar joist, steel truss, pre-cast concrete) and the ceiling
(whether hung, flush, etc.).

Ductwork Material

 - Rectangular duct should be constructed of

not lighter than No. 26 U.S. gauge galvanized iron or No. 24 B & S
gauge aluminum.

Ductwork Structure - 

All duct sections 24 inches or wider, and

over 48 inches in length, should be cross broken on top and bottom
and should have standing seams or angle-iron braces. Joints should
be S and drive strip, or locked.

Содержание CRGB Series

Страница 1: ...AquaSaver Timer Adjustment 34 Belts 24 Blocked Vent Switch 25 Blower Motors 24 Blower Rotation 24 Burner Air Adjustment 30 Burner Rack Removal 42 Burners 29 Carryover System 29 Check Installation and...

Страница 2: ...rhalogenatedhydrocarbonsorany contaminant silicone aluminium oxide etc that adheres to the spark ignition flame sensing probe b Wiring is not in accordance with the diagram furnished with the heater c...

Страница 3: ...x 19 1 2 495mm Return Air Openings with Optional Cabinet X Hanger Centerline Standard and Optional Blower Cabinet Dimensions inches andmm Gravity Vented Indoor Models XE HXE Gas Connection Natural Pr...

Страница 4: ...side the downturn plenum cabinet For dimensions with downturn plenum cabinet with a cooling coil cabinet see page 6 FIGURE1B Dimensions Outdoor Gravity VentedModel Series CRGB Vent Cap Gas Connection...

Страница 5: ...ottom of cabinet side If system has a cooling coil cabinet add length dimension on page 6 for full system length The two position discharge dampers in Option AQ8 fit in the discharge air opening The d...

Страница 6: ...ownturnPlenumCabinet factoryattachedto either type of Cooling Coil Cabinet Front View DX Coil Cabinet with Horizontal Discharge Option AU3 Liquid Line Connections 7 8 or 1 3 8 5 1 8 130 8 203 3 4 19 3...

Страница 7: ...r from inside the building openings 1 square inch free area per 1000 BTUH Never less than 100 square inches free area for each open ing See 1 in FIGURE 2 2 Air from outside through duct openings 1 squ...

Страница 8: ...the pipe hanger to a 1 threaded pipe See the suspension method on the left in FIGURE 4 As an alternative method the factory installed pipe hanger may be removed and the heater suspended as illustrated...

Страница 9: ...lled 1 Position curb cross rails and curb side rails as illustrated in FIGURE 8 page 10 If there are two side pieces to a side fasten them with splice plates and hardware as illustrated in the splicin...

Страница 10: ...e is horizontal If the system has an AU11 AU12 AU13 AU14 cooling coil cabinet there is a downturn plenum with vertical discharge Options AU2 AU3 AU11 AU12 AU13 and AU14 are not factory installed Optio...

Страница 11: ...should be supported every six feet 1 8M using a non combustible material such as strap steel or chain Do not rely on the drafthood or heater for support of either horizontal or vertical vent pipe 6 V...

Страница 12: ...re horizontal venting is required or where negative building pressure inhibits gravity venting in stall an optional power venter Option CA Use only a power venter provided by the furnace manufacturer...

Страница 13: ...mmended size is 1 2 x1 2 20 gauge FIGURE11B InstallationoftheVentCap includedinthe optionpackage andthefield suppliedPipingandSupports Oval Adapter Assy PN 103025 Venter Seal Plate P N 43446 9 Condens...

Страница 14: ...air duct should come in con tact with masonry walls Insulate around all air duct through ma sonry walls with not less than 1 2 1 is recommended of insula tion Through Unheated Space Insulate all expo...

Страница 15: ...l connections are made disconnect the pilot supply at the control valve and bleed the system of air Reconnect the pilot line and leak test all connections by brushing on a soap solution WARNING All co...

Страница 16: ...ding MUST be made in accordance with the National Electric CodeANSI NFPANo 70 latest edition or in Canada the Canadian Electrical Code Part I C S A Standard C22 1 In addition the installer should be a...

Страница 17: ...ontrols available as part of the gas and air control options Check the wiring diagram and literature supplied with the unit for operation of factory installed optional controls See FIGURE 19 for locat...

Страница 18: ...ND BLOWER MOTOR BRANCH CIRCUIT WIRE SHOULD BE SIZED TO TEMPERATURE RATING OF AT LEAST 105 C EXCEPT FOR MUST BE REPLACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A 4 CAUTION IF ANY OF THE ORIGIN...

Страница 19: ...W LEADS CAP RED 8 USE 18 GA WIRE FOR 24 VOLT CONTROL WIRING ON UNIT NONE NOTES 4 CAUTION IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED IT MUST BE REPLACED WITH WIRING MAT...

Страница 20: ...L WIRE AS SUPPLIED WITH THE APPLIANCE 3 DOTTED WIRING AND THE FOLLOWING CONTROLS ARE SUPPLIED AND INSTALLED 2 THE FOLLOWING CONTROLS ARE SUPPLIED AS OPTIONAL EQUIPMENT 1 THE FOLLOWING CONTROLS ARE SUP...

Страница 21: ...N IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE 3 DOTTED WIRING AND THE FOLLOWING CONTROLS ARE SUPPLIED AND INSTALLED 2 THE FOLLOWING CONTROLS ARE SUPPLIED AS OPTIONAL EQUIPMENT 1 THE FOL...

Страница 22: ...E SAFETY SWITCH PORTION OF THE CONTROL THE SWITCH ACTION PROVES THE PRESENCE OF THE PILOT FLAME AND ENERGIZED THE A PILOT FLAME ON EACH OPERATING CYCLE THE SENSING PROBE ENERGIZING THE PILOT GAS VALVE...

Страница 23: ...ND ENERGIZES THE MAIN VALVE THE MAIN GAS IGNITES AND THE UNIT FIRES AT LOW RATE 3 ON A CALL FOR HEAT BY THE HIGH STAGE OF THERMOSTAT THE UNIT FIRES AT FULL RATE 4 IF THE FLAME IS EXTINGUISHED DURING M...

Страница 24: ...outlet temperature turn the adjustable half of the pulley outward One turn of the pulley will change the speed 8 10 5 Tighten the setscrew on the flat portion of the pulley shaft 6 Replace the belt an...

Страница 25: ...ing pressure levels off If a restriction or excessive flue length or turns cause the sensing pres sure to become less than the switch setpoint the pressure switch will function to shut off the main bu...

Страница 26: ...e same as the one illustrated 1 Remove the access panel in the ductwork adjacent to the control compartment access panel 2 Element is retained by spring clips 3 Round gasket and metal retaining plate...

Страница 27: ...IGURE24 Signal Conditioner used in Options AG21 and AG40 Carryover Regulator Modulating Valve Single Stage Gas PrimaryGas FlowPressure Switch WhiteLabel 1 1 w c GasFlow PressureSwitch WhiteLabel 1 1 w...

Страница 28: ...per open Is there voltage between Terminal 88 and Terminal 7 Is there voltage between Terminal 4 on ignition permissive relay and Terminal 7 Replace 1 time delay relay Replace ignition permissive rela...

Страница 29: ...6 38mm 79 23 32 18 25mm 7 16 1 16 11mm 1 6 Option AH2 and spark pilot with lockout is Option AH3 NOTE Outdoor units in Canada using propane require lockout Indoor units in U S and Canada using propane...

Страница 30: ...ers cont d INDOOR Gravity Vented Furnace Models XE HXE Natural gas burners are equipped with two flash carryover systems that receive a supply of gas simultaneously with the main burner NOTE A natural...

Страница 31: ...esuppliedwithairforcombustionasrequired by Code and in Paragraph 6A of this heater installation manual MAINTAIN THE VENT SYSTEM IN STRUCTURALLY SOUND AND PROPERLYOPERATINGCONDITION lockout control if...

Страница 32: ...3 Bottom Panel Position the air hood bottom panel so that it is to the inside of the two side panels and above the factory installed support angle Attach to the side panels If the bottom panel does n...

Страница 33: ...ecessary Follow these instructions to field connect the water supply and make neces sary checks and adjustments before operating the cooling module with a lock nut and a sealing gasket Check these fit...

Страница 34: ...ockwise to increase the ON time or counterclockwise to decrease the ON time One complete turn will adjust the cycle by 12 to 14 seconds All Modules Check the reservoir for any water leaks The reservoi...

Страница 35: ...e the water feed line from the downstream side of the ball valve and unscrew the water bleed line barbed hose fitting 3 Force a fresh water supply through the water inlet hose and thoroughly flush the...

Страница 36: ...let DamperOptionsonIndoor ModelsXE HXE FIGURE 41B Location of Controls for30 OutsideAirHood andDamperOptions AR6orAR7 OutdoorModelsonly FIGURE41D Exampleof OutsideAirand Return Air Damper Linkage Damp...

Страница 37: ...w c Heater Filter Size Metal Fillers Size A B C D E F1 F2 75 100 125 20x20 20x20 150 175 20x25 20x25 13 16 13 16 200 225 16x25 16x20 16x25 16x20 250 300 20x25 20x20 20x25 20x20 350 20x25 20x25 20x25...

Страница 38: ...B D D E 25 635mm 20 508mm 20 508mm 25 635mm Size 350 D D D C C Size 400 25 635mm 20 508mm B D Key Filter Code Filter Size A 16 x 20 B 20 x 20 C 16 x 25 D 20 x 25 E 25 x 25 Shaded areas are filter blo...

Страница 39: ...d with op tional discharge dampers the damper motor wires must be connected to the terminal blocks in the furnace electrical compartment If the coil cabinet being installed does not include a downturn...

Страница 40: ...ection remove the center hole plug FIGURE 46H To install side and top fillerpanels remove screws from top corners of both cabinets and the entire row across the cooling coil cabinet Removerowofscrews...

Страница 41: ...or lint accumulation Clean as needed Check the vent system for soundness Replace any parts that do not appear sound Check the wiring for any damaged wire Replace damaged wiring See Paragraph 12 for re...

Страница 42: ...ryover systems with air pressure 40 Cleaning the Heat Exchanger To clean the outer surfaces circulating air side of the heat exchanger gain access by removing the inspection panels in the ductwork or...

Страница 43: ...causes 8 Reset lockout by interrupting control at thermostat 9 Faulty combustion air proving switch 9 Replace combustion air proving switch 10 Activated blocked vent switch indoor system 10 Correct ve...

Страница 44: ...AG39 or AG40 see page 28 For replacement parts refer to Form P X XE for indoor units or Form P RG RP RBL for outdoor units Problem Probable Cause Remedy Pump does not run Unit is 1 Electrical connecti...

Отзывы: