8
OPT-AS3,4,5,8 (07-22) 160202-B
INSTALLATION—CONTINUED
Pump/Junction Box Assembly Installation—Continued
Figure 8. Pump/Junction Box Assembly
Electrical Connections
PUMP/JUNCTION
BOX ASSEMBLY
OPERATING
LOCATION
Figure 9. Evaporative Cooling Module Factory-Installed Wiring
BL MODELS WITH
115/230/1/60 OR
230/460/575/3/60
(HEATER OPTIONS
AK3, AK6, AK7, OR
AK8) AND MODELS
ADF/ADFH 700/1200
SYSTEMS WITH
208/1-3/60 (HEATER
OPTION AK2 OR AK5)