7-18
7. Alarms
5. Reconnect the external power supply.
6. Verify that the alarm resets and the ventilator is
again powered by external power supply.
7.12.7 High Pressure
1. After the ventilator system starts up normally,
connect a test lung to the ventilator and start
ventilation.
2. Set Paw high alarm limit to current Peak+5 cmH
2
O.
3. Squeeze the test lung hard during inspiration.
4. Verify that the [
High Pressure
] alarm is activated,
the ventilator cycles into expiration, and airway
pressure falls to PEEP level.
7.12.8 Low Pressure
1. After the ventilator system starts up normally,
connect a test lung to the ventilator and start
ventilation.
2. Set Paw low alarm limit to current Peak+5 cmH
2
O.
3. Check whether the [
Low pressure
] alarm is
activated.
7.12.9 High Tidal Volume
1. Make sure a demonstration lung is connected to
the ventilator and start ventilation in VCV mode
normally.
2. Set the VT high alarm limit to be less than the
current VTe.
3. Verify that the High Tidal Volume alarm is activated.
7.12.10 Low Tidal Volume
1. After the ventilator system starts up normally,
connect a test lung to the ventilator and start
Содержание iHope RS Series
Страница 1: ...iHope Ventilator User Manual RS Series...
Страница 10: ......
Страница 12: ......
Страница 26: ...1 14 1 Safety Information For your note...
Страница 28: ......
Страница 36: ...2 8 2 General Information For your note...
Страница 38: ......
Страница 58: ...3 20 3 Installations and Connections For your note...
Страница 60: ......
Страница 74: ......
Страница 88: ...5 14 5 System Settings For your note...
Страница 122: ...6 32 6 Start Ventilation For your note...
Страница 158: ......
Страница 168: ......
Страница 186: ......
Страница 200: ...10 14 10 Cleaning and Disinfection For your note...
Страница 202: ......
Страница 203: ...11 1 11 Specifications 11 Specifications 11 1 Physical Characteristic...
Страница 230: ...11 28 11 Specifications For your note...
Страница 232: ......
Страница 233: ...A 1 A Pneumatic Diagram A Pneumatic Diagram Figure A 1 Pneumatic diagram...
Страница 240: ...C 2 C Communications Interface For your note...
Страница 248: ...E 2 E Compliance For your note...