UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
42 of 170
© 2022 Renesas Electronics
Memory Programming
Production Tests
Using ammeter instrument
Current measure
peripheral
Current measure
sleep
Start
Update configuration
parameters (statistics,
BD addresses)
Initialize PLT
hardware
Reset GU
Check temperature
sensor
Check BLE tester
instrument
Check ammeter
instrument
Toggle GU LED
Check DUT COM
ports
Temperature
measure
Power-up DUTs
Download
uartboot_da1470x.bin
Get version of
uartboot_da1470x.bin
Configuration
parameters load
GPIO watchdog
start
Download
st_fw_da1470x.bin
Get version of
st_fw_da1470x.bin
GPIO watchdog
start
OTP timestamp read
External 32Khz test
XTAL trim
UART resync
BLE scan (TX test)
GU RSSI test
GPIO/LED
GPIO connection
test
Sensor test
Custom test
Download
uartboot_da1470x.bin
Get version of
uartboot_da1470x.bin
GPIO watchdog start
QSPI/OSPI memory
init
QSPI/OSPI erase
QSPI/OSPI image
write
Custom data
memory write
OTP binary write
OTP CS write
Memory read
Scan test
Power cycle or reset
DUTs
Power cycle or reset
DUTs
VBAT level measure
Using BLE tester instrument
BLE tester TX power
BLE tester TX carrier
offset
BLE tester TX
modulation index
BLE tester RSSI
End
System initialization
Single test
Multiple tests
External instrument
Figure 20: DA1470x Test Sequence