R11UM0156EJ0240 Rev.2.40
Page 71 of 82
Jul. 28, 2020
PRIME v1.4 Base Node Tool
User Manual
Renesas Electronics Group Confidential
4
.
Remark
PRELIMINARY
Notice This is not a final specification. Some
parametric limits are Subject to change.
4. Remark
4.1
Connection the PLC line to AC line
If PLC line is connected to actual AC, the evaluation board need to be power supplied.
Figure 4.1 Power connection order