
Operation
Installation and Start-up
Commissioning
Commissioning procedure
1. Please read this guide carefully
before commissioning
2. Fit controller, make electrical
connections and switch on heat
generator and supply voltage
3. Wait until standard display appears
on
controller
4. Open hinged operating cover
When the hinged operating flap is
opened for the first time after switching
on, the "INSTALLATION" is shown on
the display.
5.
Ä
Start INSTALLATION
6.
Ç
Set value
7.
Ä
Save value and next value
8. Close hinged operating flap (end
of INSTALLATION)
9. Move program switch to required
operating mode, e.g. automatic 1
(see page 4)
BUS- ID (Heating circuit number):
The heating circuits are sequentially
numbered starting with "01". heating
circuit numbers must not be assigned
twice. Please only use "00" for
replacement controllers.
Commissioning level
All the values in this level must be entered in sequence without interruption
Ä
Open level,
Ç
adjust value,
Ä
save value and activate next value
GERMAN
Set language
TIME
Set current time:
1. Minute =>
Ä
=> 2. Hour
YEAR
Set current date
MONTH
Set current date
DAY
Set current date
BUS ID I
(see p. 47)
Enter heating circuit number"1":
00-15 => Standard 01
BUS ID 2
(see p. 47)
Enter heating circuit number"2":
00-15 => Standard 02
5K SENSORS
00 = 5KOhm NTC sensor
01 = 1kOhm PTC sensor
code no. required; after input, there is
a restart of the controller
40
Содержание E8.1121
Страница 43: ...Notes 43 ...