background image

Removing the actuator

Proceed as follows to replace the actuator:

1.

Pull the safety split pin below the actuator out

so that the actuator can be removed [1].

2.

Pull the actuator away from the valve body

[2].

1

2

VA

LVE

ACTU

AT

OR

ASSEMBLING

3.

Re-install the new drive in reverse order.

In order to replace the entire changeover valve, the

hydraulic connection for the valve [1] that is to be

replaced must be closed and bled accordingly.

After bleeding, you can loosen the three valve [1]

screw connections. After replacing one or both

valves [1], ensure that no air bubbles have formed

in the heat exchanger [2]. If there is air in the heat

exchanger [2], this can be bled manually via the

connections [3] in the upper part of the cooling

module for both sides. All screw connections must

be checked after replacing.

3

B

AB

A12

A

B

AB

A

S 13

A12

3

2

1

1

 

 

 

 

 

13

Содержание KNGcooling module

Страница 1: ...Installation instructions Read the instructions prior to performing any task REMKO cooling module Cooling module for the WSP heat pump range 0261 2020 03 Edition 1 en_GB...

Страница 2: ...ead these operating instructions carefully before commis sioning using this device These instructions are an integral part of the system and must always be kept near or on the device Subject to modifi...

Страница 3: ...tion and changes 5 1 9 Intended use 5 1 10 Safety conscious working 6 1 11 Warranty 6 1 12 Transportation and packaging 6 1 13 Environmental protection and recycling 6 2 Technical data 7 2 1 Unit data...

Страница 4: ...fatal or cause serious injury WARNING This combination of symbol and signal word warns of a potentially hazardous situation which if not avoided may be fatal or cause serious injury CAUTION This comb...

Страница 5: ...s n The setup connection and operation of the units and its components must be undertaken in accordance with the usage and operating conditions stipulated in this manual and comply with all applicable...

Страница 6: ...d make a note of any damage or missing parts on the delivery note Inform the forwarding agent and contractual partner Claims under guarantee made at a later date will not be accepted WARNING Plastic f...

Страница 7: ...hes 1 1 4 flat sealing Cooling mode dimensions Height mm 450 Width mm 650 Depth mm 150 Technical data for 3 way changeover valve Cvs value pressure loss 1 bar m3 h 7 5 Rated pressure bar 10 Switching...

Страница 8: ...15 16 4 1 4 15 2 6 23 18 7 7 0 Cooling capacities of the WSP 140 WSP 180 heat pumps Inlet temperat WSP C Outlet temperat WSP C Air volume flow WSP m3 h Brine circuit temperature C Cooling capacity kW...

Страница 9: ...0 1 2 1 4 1 6 1 8 2 0 2 2 2 4 2 6 2 8 3 0 3 2 3 4 3 6 Q m h 0 10 20 30 40 50 W P1 2 1 3 3 4 Fig 1 Circulation pump Grundfoss UPM 3 25 70 130 capacity range 1 Pressure kPa 2 Height m 3 Medium flow rat...

Страница 10: ...85 130 220 130 85 G 1 WSP 80 110 G 1 WSP 140 180 150 65 60 123 100 650 450 27 Fig 2 Unit dimensions all measurements in mm We reserve the right to modify the dimensions and design as part of the ongoi...

Страница 11: ...oling capacity that is available is limited entirely to the source capacity and should be checked accordingly to ensure that it is suitable for the purpose Depending on the type and version of the sou...

Страница 12: ...oor unit s I O module To do this unplug the plug installed for this from the I O mod ule s terminal block and replace it with the S 13 plug that is already attached to the probe cable from the cooling...

Страница 13: ...ver valve the hydraulic connection for the valve 1 that is to be replaced must be closed and bled accordingly After bleeding you can loosen the three valve 1 screw connections After replacing one or b...

Страница 14: ...e pipe network before connecting the heat pump n The heating cooling system provided by the customer must be protected to prevent the temperature falling below the dew point con densation water The RE...

Страница 15: ...site must be planned and installed by the installation contractor M M M M B AB A12 A B AB A S 13 A12 S 08 A10 B AB A S 09 A 04 S 08 A 22 23 A 10 A B C1 2 3 1 D C2 E B AB A12 A B AB A S 13 A12 A Heat p...

Страница 16: ...0 S D N G 2 0 S Sensor Inputs D N G 3 0 S D N G 4 0 S D N G 5 0 S D N G 6 0 S D N G 7 0 S D N G 8 0 S Sensor Inputs D N G 9 0 S D N G 0 1 S 1 S D N G 1 D N G 2 1 S D N G 3 1 S D N G 4 1 S D N G 5 1 S...

Страница 17: ...be made at expert level To do so touch the REMKO logo in the upper right corner of the display User level Activate Expert level by touching the REMKO logo at the top right Password input using Passwor...

Страница 18: ...the pressure gauge n Make sure that all valves of the heating system and the distributors are open to guarantee the free medium flow rate n Check the direction of flow of the heating cycle indicated o...

Страница 19: ...ure that no caustic abrasive or solvent based cleaning products are used Use of powerful water jets is to be avoided Cleaning the heat source site NOTICE A dirt trap must be installed in the heat sour...

Страница 20: ...ter the brine cycle Check the brine level or filling pressure of the brine cycle and the pre pressure of the dia phragm expansion vessel at regular intervals You can read the filling pressure of the b...

Страница 21: ...d spare parts Exploded view of the unit 1 3 2 3 2 4 Spare parts list No Designation EDP no 1 Heat exchanger 2 Actuator for 3 way valve 1120912 3 Hydraulic bottom part 1 1120912 1 4 SMT PT1000 brine re...

Страница 22: ...M Maintenance 19 O Operating the controller 17 P Packaging disposal 6 R Recycling 6 Removing the actuator 13 S Safety Dangers of failure to observe the safety notes 4 General 4 Identification of note...

Страница 23: ......

Страница 24: ...5232 606 260 E mail info remko de URL www remko de REMKO GmbH Co KG Klima und W rmetechnik Im Seelenkamp 12 32791 Lage Hotline within Germany 49 0 5232 606 0 Hotline International 49 0 5232 606 130 W...

Отзывы: