5 Installation
5.1
Positioning the boiler
Refer to the lifting instructions document on how to unpack and transport
the boiler to the location.
1. Manoeuvre the boiler to the exact location.
2. Unscrew the levelling feet until they stand firmly on the floor.
3. Open the casing by lifting up the front panel and taking it off.
4. Adjust the levelling feet to level the boiler.
5. Check if the boiler is resting solely on the levelling feet (transport
wheels must be off the floor).
5.2
Connecting the heating circuit
For boiler Gas 620 Ace, apply the instructions to each boiler module.
Fig.35
Place the boiler
AD-3001416-02
1
2
Fig.36
Open the casing
AD-3001417-02
3
Fig.37
Level the boiler
AD-3001418-02
4
5