Reliance Foundry Concrete Bollard Скачать руководство пользователя страница 1

1-877-789-3245  |  [email protected]  |  www.reliance-foundry.com

Concrete Bollard Installation 

New Concrete

Parts List 

Installation Equipment

#

PART

QTY

1

Concrete Bollard

1

3

Fitted Rebar Template (supplied)

1

Auger

Chalk/Marker

Dirt Tamper

Measuring Tape

Level

Shovel

To protect the finish, keep bollards in packaging 

until exact moment of installation.

Handle with care to avoid scratching or 

damaging bollard surfaces.

Consider local soil conditions before 

proceeding with bollard installation.

Bollards shown in the diagrams may not be the same model as the bollards shipped in this order. This does not affect the integrity of the installation.

Before Installation

STEP 1: 

Study the site plans and mark the intended 

location of each bollard on the plan.

 

STEP 2: 

Always check for hazards such as water pipes, 

gas lines, and underground wiring before digging.

 

STEP 3: 

Please consult your local Building Code 

Department to determine the recommended depth 

below the frost line for digging in your area. Choose a 

minimum of this or 

12

", whichever is greater. This is the 

total digging depth. The diameter of the hole should 

extend to a minimum of 

??? (not mentioned in product 

drawing either...

".

STEP 4: 

Center the auger on the installation mark and 

bore a hole to the required depth and diameter.

PARTS LIST

DESCRIPTION

PART

NUMBER

QTY

ITEM

Concre

te 

Bollard

R-9701

1

1

Rebar

15mm 

Epoxy

Coated

rb1536

3

2

1

2

FROST LINE

12"

??

Отзывы: