background image

1-877-789-3245  |  [email protected]  |  www.reliance-foundry.com

Collapsible Bollard Installation

Fold-Down

Mounting

Parts List 

Installation Equipment

#

PART

QTY

1

Fold-Down Bollard

1

2

Fold-Down Base

1

3

Hexagon Socket Button Head Cap Bolt 3/8"

2

4

Hex Nut Nylon Lock 3/8"

2

5

Hexagon Socket Button Head Cap Bolt 1/2"

4

6

Stainless Steel Washer 1/2"

4

7

Drop-in Concrete Insert 1/2"

4

8

Padlock (optional)

1

5/8" Masonry Drill Bit

Hammer

1/2" Insert Setting Tool

Hammer Drill or Rotary Hammer

9/16" Wrench

Broom/Pressure Washer

5/16" Hex Key

Vacuum

7/32" Hex Key

Level

Chalk

Measuring Tape

To protect the finish, keep bollards in original 

packaging until exact moment of installation.

Handle with care to avoid scratching or 

damaging bollard surfaces. 

Once scratched, bollards cannot be repaired 

to original form without re-finishing the entire 

surface.

Bollards shown in the diagrams may not be the same model as the bollards shipped in this order. This does not affect the integrity of the installation.

Before Installation

STEP 1: 

Always check for hazards such as water pipes, 

gas lines, and underground wiring before digging. 

STEP 2: 

Use a broom or pressure washer to clean the 

concrete surface prior to bollard installation.

STEP 3: 

Study the site plans to locate and mark the 

precise center point of each bollard. For secure 

installation, ensure there is a minimum radius* of solid 

concrete around each mark.

* Concrete insert manufacturers such as www.ucanfast.com 

recommend a radius of 9"

1

2

3

4

6

5

7

8

Отзывы: