background image

 

INSTRUCTIONS FOR THE RELIANCE 

Panel/Link

®

 - TC Series 

THE  RELIANCE  PANEL/LINK®  TRANSFER  PANEL  IS 
NOT  FOR  “DO-IT-YOURSELF”  INSTALLATION.    It 
must be installed by a qualified electrician thoroughly 
familiar  with  all  applicable  electrical  and  building 
codes. 

This  Reliance  Panel/Link®  Transfer  Panel  contains  the 
transfer mechanism for providing an alternate input from a 
supplemental  power  source,  such  as  a  generator.    In the 
event  of  a  power  outage,  it  is  designed  to provide a safe 
and  simple  method  of  powering  the  panel  bus  from  a 
portable  generator.    The  unique  factory-installed 
mechanical interlock between the circuit breakers feeding 
the  panel  bus  prevents  feedback  by  prohibiting  the  Utility 
breaker and the Generator breaker from being in the “ON” 
position at the same time.

 

KEY  COMPONENTS  OF  THE  PANEL/LINK® 
TRANSFER PANEL 

UTILITY CIRCUIT BREAKER.  This is the double-pole 
circuit breaker on the left-hand side of the panel, and it 
controls the supply of power from the utility line to the 
panel bus.  It will generally be “ON” when utility power is 
present. 
GENERATOR CIRCUIT BREAKER.  This is the double-
pole circuit breaker located directly to the right of the Utility 
breaker. This controls the supply of power from the 
alternate source, such as a generator.  It will remain “OFF” 
when the Utility circuit breaker is “ON”. 
BREAKER INTERLOCK MECHANISM.  This is the 
mechanical linkage located between the Utility circuit 
breaker and the Generator circuit breaker.  It prevents 
both of these breakers from being in the “ON” position 
simultaneously, and is the safety feature that prevents 
feedback between the utility source and the generator. 

INSTALLATION 

 

 

 

 

DANGER!  HAZARDOUS VOLTAGE.  DISCONNECT 
ALL ELECTRICAL SUPPLY SOURCES BEFORE 
INSTALLATION AND WHEN SERVICING CONNECTED 
EQUIPMENT OR CIRCUITS. 

This panel is installed in a manner similar to either a 

service 

entrance load center or a sub panel, and in accordance 
with all applicable electrical codes.  See the wiring diagram 
on the inside cover of the panel. If being used as a sub 
panel, a separate grounding bar must be added to the 
panel.  If being used as service entrance equipment, the 
ground screw provided must be used to bond the cabinet 
to the neutral/ground bar.  Separate ground and neutral 
wires of the appropriate size must be installed between the 
transfer panel and any other panel or panels either being 
feed by or from the transfer panel. 
For generator connections and operation follow the 
generator manufacturer’s instructions, as well as all 
applicable code requirements. Your generator must have a 
combination 120/240 volt output, which duplicates that 

provided by the electric utility.  The two 240 volt hot legs of 
this output must be connected to the two Generator circuit 
breaker terminals.  The neutral of this output must be 
connected to the transfer panel neutral bar, thus providing 
the required combination 120/240 volt input.  To facilitate 
connection to the transfer panel, a remotely located Power 
Inlet Box such as the Reliance Cat. No. PB30 or PB50 
may be convenient

 

OPERATION   

 

 

 

 

TRANSFERRING FROM UTILITY POWER TO 
GENERATOR POWER 
1.  Move Utility circuit breaker handle to the “OFF” 
position. 
2.  Move all branch circuit breaker handles in panel being 
feed by the transfer panel to the “OFF” position. 
3.  Move Generator circuit breaker handle to the “ON” 
position. 
4.  Insert the male power cord connector plug into the 
appropriate outlet on the generator. Rotate to lock. 
5.  Plug the female end of the power cord from the 
generator into the power inlet that is interconnected to the 
transfer panel.  Rotate to lock. 
6.  Start the generator, following the procedures described 
in the generator owner’s manual furnished by the 
generator manufacturer. 
7.  Select the circuits to be powered by the generator by 
moving the corresponding branch circuit breaker handles 
to the “ON” position.  Alternate use of larger loads such as 
furnace motors, well pumps, freezers, etc., so that the 
capacity of the generator is not exceeded.  Do not attempt 
to operate any loads in excess of the capacity of the 
generator. 

 

TRANSFERRING FROM GENERATOR POWER BACK 
TO UTILITY POWER 
1.  Follow the procedures in the generator owner’s manual 
to turn off the generator. 
2.  Unplug the power cord. 
3.  Move the Generator circuit breaker handle to the “OFF” 
position. 
4.  Move the Utility circuit breaker handle to the “ON” 
position. 
5.  Return all branch circuit breaker handles to the “ON” 
position. 
To insure that your generator will always be ready when 
you need it, it is very important to run it under load on a 
regular basis and to keep the tank filled with fresh fuel.  
Perform the above operating steps at least once a month 
to keep the generator properly exercised. 

 

INSTRUCTIONS POUR LA RELIANCE 

Panel/Link

®

 - TC Series 

LE PANNEAU DE TRANSFERT DE PANEL/LINK® DE 
CONFIANCE N’EST PAS POUR L’INSTALLATION DE « 
BRICOLAGE

 ».  Il doit être installé par un électricien 

qualifié et parfaitement au courant de tous les codes 
électriques et de construction applicables. 
Ce panneau de Reliance/lien panneau de transfert® 
contient le mécanisme de transfert pour fournir une entrée 

Отзывы: