Annex
Operating_Manual_Fan_KXE_04_en.docx
122 / 128
The following checklist should be observed as a record of
the inspections performed.
Checklist for inspections performed (example)
REITZ
fan no.
319660
Date of initial
commissioning
12/2/2015
Time
Measures implemented
Date
Authorised person
Printed name
Signature
1
st
month
Bearing of fan shaft
inspected, shaft seal
checked, condensate
drained, fan running
smoothly
12/3/2015
T. MILLER
Miller
Checklist for inspections performed
REITZ
fan no.
Date of initial
commissioning
Time
Measures implemented
Date
Authorised person
Printed name
Signature
1
st
month
2
nd
month
3
rd
month
4
th
month
5
th
month
19. Annex
19.1 Inspections in accordance with
the checklist