FMC-SG / FMC-SGR  

COLUMN FOR SAFEGATE LIGHT CURTAINS 

GENERAL 

The present mounting instruction contains information about: 

 

The correct mounting of the light curtains SAFEGATE inside the FMC-SG/FMC-SGR columns. 

 

The correct assembly of the plate and cover for FMC-SG/FMC-SGR columns.  

 

The assembly of the FMC-SG/FMC-SGR columns on the FMC-CB/FMC-CBL stand bottom.  

 

The correct alignment of emitters and receives (with our without mirror).  

 

Please  Note:  find  detailed  information  about  the  function  of  the  light  curtains  /  light  grids  in  the  relevant 
mounting and wiring instructions.  

 

MOUNTING BASE PLATE  

 

Fasten the base plate as shown in Figure 11, using the provided screws, T.B.E.I. M6x16. 

 

 

 

 

Figure 11 

 

Содержание FMC-SG Series

Страница 1: ...ssembly of the plate and cover for FMC SG FMC SGR columns The assembly of the FMC SG FMC SGR columns on the FMC CB FMC CBL stand bottom The correct alignment of emitters and receives with our without mirror Please Note find detailed information about the function of the light curtains light grids in the relevant mounting and wiring instructions MOUNTING BASE PLATE Fasten the base plate as shown in...

Страница 2: ... horizontal using a circular spirit level To operate the regulation act on the three hexagonal nuts B until the perfect levelness is reached MAXIMUM ADJUSTMENT 10mm If the ground roughness is over 10mm flush it adequately Loosen the three allen screws and remove the washers Figure 12 Place the column base plate on the FMC CB FMC CBL stand bottom Figure 13 Fix the column tightening the three allen ...

Страница 3: ...lumn Figure 14 Temporarily screw the M6x15 B screws on the pins one screw rotation Insert the barrier from the top into the column making sure that all the inserts slide in the slot on the back of the barrier Figure 15 When the correct position is achieved dimension H table 1 lock the allen screws to fix the barrier Figure 15 Fix the cover on the top of the column see next paragraph B A Figure 14 ...

Страница 4: ...und according to EN13855 2010 Figure 16 MOUNTING OF COVER WITH SPIRIT LEVEL Secure the cover with spirit level as shown in Figure 17 using the supplied screws Figure 17 MODEL H Distance between the first light beam and the ground mm FMC SGB2 FMC SGB2R 400 mm FMC SGB3 FMC SGB3R FMC SGB4 FMC SGB4R FMC SG1700 FMC SG1700R FMC SG2000 FMC SG2000R 300 mm Table 1 ...

Страница 5: ...e columns of emitter and receiver are in vertical position placing a spirit level A on the top end of each stand Perform leveling fine adjustments by means of the hexagonal nuts of the stand bottom B Connect the light curtain ref Technical manual For an exact alignment of emitter and receiver loosen the three allen screws C that fix the rotation flange and rotate the two columns until the barrier ...

Страница 6: ...ector in the PG11 plastic fitting housed in the column Figure 19 DIMENSIONS Figure 20 PLASTIC FITTING PG11 MODEL FMC SG2 SG3 SG4 SG2R SG3R SG4R Dimension A mm 1000 1200 1330 Dimension B mm 1055 1255 1385 MODEL FMC SG550 SG1700 SG2000 SG550R SG1700R SG2000R Dimension A mm 550 1700 1970 Dimension B mm 605 1755 2025 SPIRIT LEVEL ...