reechcraft.com/powerlift 888-600-6160
21
PREPA INSPECTION
SECTION
2
Figure 2.5
- Platform Mounting and Retaining Pins
Mount Pin Openings
Mount Pin
Openings
Input Hex
Shaft
Entry Gate
Platform
Retaining Pin
Mount Pins
Mount
Pins
Entry Gate
• Platform and Entry Gate
- Check to be sure that the mounting pins are not
loose, platform railing is undamaged, platform retaining pin is functioning
properly, self closing slide gates are functioning properly, and no cracks or
visible corrosion are present. (See Figure 2.5)