NOTE: The roof vent may be positioned in any of the Tunnelhouse sections; however, you cannot fit the roof vent in a section 
directly beside another section that might already have a roof vent.  
(This is because the ends of the vent require clearance for an overlap.  
 
NOTE: When you have decided which section to place the roof vent in, you will need to cut and remove the ridge purlin in that 
section. see (Pic V1) next page 

1.

 

Before fitting the roof and side covering - Lift the roof vent complete into place at the apex of the Tunnelhouse, - the ends of 
the roof vent upstands will rest on the top face of the hoops. 

2.

 

Screw the four “L brackets” onto the flat side face of the tunnel hoops. see (Pic V1) next page 

3.

 

Before you fit the cover onto the building stage 4.  - You will need to disconnect the roof cap by undoing the four bolts that 

hold the vent in place on the upstand.  Remove the roof folded cap and aluminium vent arms + handle completely. (this will 
be re-fitted later) 

4.

 

 

 
With the vent removed, you can now proceed to fit the main roof cover. 

 

                 (Pic V1) Vent “L” Bracket  x 4, Vent rails Vent Upstands              (Pic V2)  Roof vent cap and Vent arms + Handle 

    

 

Note: The ridge beam purlin should be removed from the vent location space; the vent rails replace the ridge purlin in the vent space.

 

 

IF YOU HAVE A ROOF VENT OPTION

 

After the main roof and sidewall covering has been fitted, - you can re-fit the cap vent (see pictures below) 

1.

 

 In the section where the vent is to fit – Use a knife or scissors to slice the cover at the center apex for the length of the roof 

vent rails 

2.

 

Then slice the cover toward the corners of each vent rail.  See (Pic V4) below 

3.

 

Insert the Lockstrip holding system into each of the vent upstand rails 

4.

 

Insert a 100mm piece of Lockstrip  clips x 2 into the top edge of the hoops at each end of the roof vent (this goes 

between the vent rails) 

5.

 

Secure the edge of the cover onto the top edge of the upstand using the white Omega clips provided see(Pic V5) below 

6.

 

Trim the excess film behind the Omega clip and also at the end of the roof vent opening away 

7.

 

Re-locate the roof cap and aluminium arms + handle up into place and re-connect the nuts/bolts/washers to the upstand.

 

8.

 

Test the roof vent for open / close action and adjust if needed.

 

 
 
 
 
 
 

Содержание Domestic Tunnel 2.36x1.5m

Страница 1: ...ssible The Tunnelhouse is already partly pre assembled We suggest you take your time and allow yourself a weekend to erect the frame and fit the covering Call us on Free Ph 0508 733 728 with any questions during assembly For standard sites place a 600mm ground peg at 1m apart along the length and width of the building If your ground is sandy or loose or if you have a windy site then ground pegs wi...

Страница 2: ...lating you may wish to build an additional timber frame base for the tunnelhouse using 100mm x 50mm or 150mm x 50mmm timber rails The dimensions for a timber frame option are shown below Extra base materials are not supplied Ensure that dimensions A B are accurate As these are precise inside measurements enabling the interior base rail of the tunnelhouse supplied to match the inner edges of your t...

Страница 3: ...207mm 2 36m x 18m 2300mm 18032mm 18178mm 2 36m x 21m 2300mm 21032mm 21157mm 2 36m x 24m 2300mm 24032mm 24142mm Stage 1 Stand up the door end and the louvre end walls The Tunnelhouse is supplied with end frames pre assembled With assistance stand these up in a vertical position triangular brackets face to the inside The side base rails finish flush with the front face of the end base rails see Pic ...

Страница 4: ...pe to the top face of the internal hoops only to help prevent cover chaffing do not install to end hoops see Pic POL1 below For the 15m 18m 21m 24m models fit the horizontal collar tie to each central hoop NOTE 1 We suggest not securing the internal hoops into place with the two screw s at their base saddles until after the covering has been fitted This will allow the hoops to be lifted upward sli...

Страница 5: ...in the roof curve as shown below For high wind kit models also place a purlin 125mm up from the base rail Place 24mm Polyguard along the length of all purlins to their outside face Fit 24mm Polyguard end dwangs at both ends NOTE If an optional sidewall shelf unit is to be fitted the lowest purlin should be placed above the shelf bracket height position Wrap two layers of Polyguard tape around Purl...

Страница 6: ...nit Pic B1 Pic B2 Secure the side wall brace Pic B3 Stage 4 The cover holding systems and fitting the cover s There are two types of cover holding systems used on this tunnelhouse You will note that the shape of the grooves in the aluminium end frame and base rail door is differs between the two types System 1 Lockstrip is used for the top face and front face of the end hoops It is also used on th...

Страница 7: ... by tilting it as shown below and as you press it down and into the groove release the tension from behind to allow the channel insert to drop into place A Locking Lug Forward B Tilt Channel Insert C Fully Seat Channel Insert then fit Bead The channel insert with its front Locking Lug edge facing forward is inserted first Tilt the front edge down B whilst easing cover tension from behind locate th...

Страница 8: ...e rope helps to stop the covering from draping down between the hoops and assists with you placing tension on the cover NOTE If your Tunnelhouse has a roof vent take care not to catch the cover on the vent rail upstands see Pic V1 above when laying it out into position NOTE The print name on the cover should face to the inside of the Tunnelhouse so that the text reads correctly left to right Remin...

Страница 9: ...oceed to fit the main roof cover Pic V1 Vent L Bracket x 4 Vent rails Vent Upstands Pic V2 Roof vent cap and Vent arms Handle Note The ridge beam purlin should be removed from the vent location space the vent rails replace the ridge purlin in the vent space IF YOU HAVE A ROOF VENT OPTION After the main roof and sidewall covering has been fitted you can re fit the cap vent see pictures below 1 In t...

Страница 10: ... approximately in position at the apex of the hoop Fit one 200mm pre cut piece of lockstrip insert and L clip into the front face of the frame to temporarily hold the end cover Whilst placing some tension on the covering Fit another 200mm pre cut piece of lockstrip at the point where the curve of the end hoop stops and the straight part of the sidewall begins approximately the 9 o clock and 3 o cl...

Страница 11: ...of the Duralock 2 bead on top of the base rail in the door opening to act as a packer 2 Slide the door track onto the two door rollers that are already attached to the door frame 3 Lift the door track complete with door attached into approximate position resting it onto the packers 4 Lift up the door track slightly so that the weight of the door is suspended on the track 5 Screw through the door t...

Страница 12: ...s NZ spray this on 24hours prior to rainfall Wash down the interior of the tunnel house to prevent any fertilizer or chemical degradation Patch any holes or tears in the cover as they occur with all weather tape or Patchbond tape Check annually that foundations are secure all bracket screws are tight replace any missing or broken screws check that door rollers and vent mechanisms are operating smo...

Страница 13: ...Effective from 12 Nov 20 Page 13 General view 7 5m model single front door 1 x roof vent high wind kit General view interior 6m model high wind kit interior ...

Страница 14: ...Effective from 12 Nov 20 Page 14 General view 3m model with high wind kit fitted internal raised gardens included General view 6m model rear wall louvre ...

Отзывы: