background image

4

Supplies required to assist during the removal procedure

:

  

Blocking

- 10 x 8 x 43 inches / 250 x 200 x 1100 mm 

- required for section 0.13.2 

Pallet

- 40 x 70 inches /1000 x 1800 mm 
- required for section 4.3 

 

Locking Mechanism

- required for section 3

Gear Puller

- required for section 2.4

Requirements:

 

Содержание NH CR

Страница 1: ...r Installation of Redekop MAV Straw Chopper SCU Ready CH0214 01_R0 Feb_2022 Redekop Manufacturing 2014 Saskatoon SK Canada S7K 3J7 Ph 1 306 931 6664 1 866 REDEKOP 1 866 733 3567 Email info redekopmfg...

Страница 2: ...ty 0 Drive Shield Removal 1 Disconnect Wire Harness 2 Fuel Tank Support Removal 3 Drive Belt Removal 4 Rear Upper Roof Panel Removal 5 Chopper Removal 6 Spreader Removal 7 Draper Conveyor Removal 8 Dr...

Страница 3: ...Drive Belt 6 Rear Upper Roof Panel 7 Chopper 8 Spreader 9 Draper Conveyor 10 Jackshaft 11 Upper Drive Sheave 12 Seed Loss Monitor Panel NH CR Factory Component Removal Guide for Installation of Redek...

Страница 4: ...oval procedure Blocking 10 x 8 x 43 inches 250 x 200 x 1100 mm required for section 0 13 2 Pallet 40 x 70 inches 1000 x 1800 mm required for section 4 3 Locking Mechanism required for section 3 Gear P...

Страница 5: ...he most serious hazards WARNING or CAUTION safety signs are located near specific hazards or precautionary areas in this manual 0 4 Follow Safety Instructions 0 4 1 Carefully read all safety messages...

Страница 6: ...achine only when all guards are correctly installed Before moving away always check immediate vicinity of machine e g for children Ensure adequate visibility Use a horn as a warning immediately before...

Страница 7: ...stalled Fix damage immediately Replace worn or broken parts Remove any buildup of grease oil or debris On self propelled equipment disconnect battery ground cable before making adjustments on electric...

Страница 8: ...ed within a few hours or gangrene may result Doctors unfamiliar with this type of injury should reference a knowledgeable medical source 0 13 Dispose of Waste Properly 0 13 1 Improperly disposing of w...

Страница 9: ...employees shall determine appropriate Personal Protective Equipment required for this assembly Personal Protective Equipment PPE are devices worn by the employees to protect against hazards in the en...

Страница 10: ...uisher upright and aim hose at base of flames 5 Squeeze lever to discharge fire extinguisher 6 Move hose to cover the source of the fire evenly with extinguishing agent CAUTION Do not risk personal in...

Страница 11: ...11 1 1 Lift up the left side access panel A 1 Drive Shield Removal C C B1 A 1 2 Remove drive shield C B 1 1 1 Turn Master Power Off B...

Страница 12: ...chopper 2 4 Tie harness up out of the way C1 C D D D 2 Disconnect Wire Harnesses 2 1 Disconnect wire harness B from left rear light B1 cut nylon cable ties B B1 3 Fuel Tank Support Removal 3 1 Drain f...

Страница 13: ...and secure to the auger bracket F and handrail G 3 3 2 Secure a ratchet strap E to the rear fuel tank bottom support bracket C near the middle and secure to the handrail 3 3 2 Tighten straps E F C D E...

Страница 14: ...ure required only if SCU is being installed Do NOT remove drive belt if SCU is NOT being installed 4 1 Loosen belt tensioner A on jackshaft B 4 1 1 Rotate tension link pivot A1 clockwise A1 B C A 4 2...

Страница 15: ...re A1 x3 both sides 5 2 Remove top mounting hardware A2 x5 5 3 Remove rear upper roof panel A A A1 A2 A 6 Chopper Removal This component weighs 500 lbs 230 kg Use a forklift with appropriate capacity...

Страница 16: ...lt B from jackshaft C C B2 6 3 Raise a pallet D with extra blocking D1 underneath the chopper A to hold the chopper in place when all supports are removed secure rear end of chopper down for the chopp...

Страница 17: ...e F1 x3 mounting suppport plate F to combine may have to loosen hardware F2 on inside of combine both sides F F F1 F F2 6 5 Remove chopper mounting hardware A2 x4 from combine wall both sides A2 6 7 R...

Страница 18: ...sleeve A1 7 2 Disconnect electrical connector B A A1 A B A B 7 3 Ensure spreader C is horizontal 7 3 1 Lay hydraulic hoses and electrical harness on top of spreader C C C 7 4 Provide blocking D below...

Страница 19: ...19 8 Draper Conveyor Removal 8 1 Disconnect and remove sensor B for draper conveyor A B A B 8 2 Remove hydraulic motor and mounting bracket C mounted to outer left side of combine C...

Страница 20: ...20 C G 9 1 Remove draper hyd motor K from combine K K1 K2 K3 H Parts List HH147 Hyd Hose 5 x 24L C Qty 1 H14 06F Fit Hyd Cap 6 FORS G Qty 1 9 Draper Hydraulic Motor Removal...

Страница 21: ...21 G H 9 3 Install cap fitting G to tee fitting K3 K3 H K3 K1 9 2 Disconnect hyd hose K1 from tee fitting K3...

Страница 22: ...22 9 4 Remove hyd hoses K2 x2 from hyd block H H K2 K2 9 5 Install hyd hose C to hyd block H ports where hoses K2 were removed from to create a loop H C...

Страница 23: ...D both sides A D D D A D 9 7 Remove top mounting bolts A1 mounting draper conveyor A to top of side angle mounting plate A2 both sides A A1 A2 9 8 Remove draper conveyor A off of side angle mounting...

Страница 24: ...ft A to combine side wall A1 A A 11 Upper Drive Sheave Removal Procedure required only if SCU is being installed Do NOT remove upper drive sheave if SCU is NOT being installed 11 1 Remove drive belt B...

Страница 25: ...ng a gear puller D do not use a gear puller that pulls on the flanges or ribs 12 Seed Loss Monitor Panel Removal 12 1 Remove panel A below seed loss monitor B A A1 D A B Note Heat may be required to l...

Отзывы: