red lion DAS00PN1EE200000 Скачать руководство пользователя страница 1

DA_Dual Ethernet - A 

Drawing No. LP1112

Effective 07 2020

DA Dual Ethernet Sled 

Installation Guide

1

PACKAGE CHECKLIST

This product package should contain the items listed below. If 

any items are missing or damaged, contact Red Lion immediately.

 - DA Dual Ethernet Sled

 - Installation Guide

SAFETY SUMMARY

All safety related regulations, local codes as well as instructions 

that appear in this document or on equipment must be observed 

to ensure personal safety and to prevent damage to either the 

device or equipment connected to it. 

Do not use these products to replace proper safety interlocking. 

No software-based device (or any other solid-state device) should 

ever be designed to be responsible for the maintenance of 

personnel safety or consequential equipment not equipped with 

safeguards. Red Lion disclaims any responsibility for damages, 

either direct or consequential, that result from the use of this 

equipment in a manner not consistent with these specifications.

SPECIFICATIONS

1. 

POWER REQUIREMENTS

: Power is supplied by the DA host 

controller. 

Max Power: 2.1 W

2. 

INTERFACES:

Two 10/100 BaseTX RJ-45 Ports, auto MDI/ MDI-X.

Individual isolation from Ethernet network to controller:  

1500 Vrms

3. 

ENVIRONMENTAL CONDITIONS

:

Operating Temperature Range: -40 to 75 °C

Storage Temperature Range: -40 to 80 °C

Vibration to IEC 60068-2-6: Operational 5-500 Hz, 2 g

Shock to IEC 60068-2-27: Operational 15 g

Operating and Storage Humidity: 0 to 95% max. RH non-

condensing

Altitude: Up to 2000 meters

4. 

CERTIFICATIONS AND COMPLIANCES

:

Refer to the controller manual for agency certifications.

CE Approved

EN 61326-1 Immunity to Industrial Locations

Emission CISPR 11 Class A

IEC/EN 61010-1

RoHS Compliant

5. 

INSTALLATION REQUIREMENTS

: Sled must be installed 

inside the unit case with the hardware provided. See 

“Installing the Dual Ethernet Sled” for more details.

6. 

WEIGHT

: 7.05 oz (200 g)

INSTALLING THE DUAL ETHERNET SLED

    

DA50 INSTALLATION

1. Prior to installing the Sled for your DA50 application, ensure 

that the unit is not receiving power.

2. Disconnect and remove your DA50 from the DIN rail.

3. Remove the DA50 unit’s front cap by squeezing the sides and 

pulling.

4. Slide out the sled holder.

5. Install the sled into the sled holder and hand tighten the 

captive fasteners, or use a screwdriver.

6. Re-install the sled holder containing the sled into the 

Converter. Make sure it is fully seated.

7. Replace the front cap. 

CAUTION: Risk of Danger 

Read complete instructions prior to installation and 

operation of the unit.

ATTENTION : Risque de danger

 

Lire les instructions complètes avant l’installation et 

l’utilisation de l’appareil.

CAUTION

: Follow standard ESD precautionary 

procedures.

ATTENTION

: Suivez les procédures de précaution 

standard de décharge électrostatique.

WARNING - Disconnect all power to the unit before 

installing or removing sleds.
AVERTISSEMENT - Débranchez l’alimentation électrique 

de l’appareil avant d’installer ou de retirer les tiroirs.

 

z

Dual 10/100TX Ethernet communication

 

z

Industrial rated for harsh environments

 

z

Wide operating temperature range

 

z

Simplified deployment architecture

 

z

Field installable

 

z

Individually isolated ports

For use with DA50 and DA70 series covered in DEMKO 20 ATEX 

2268X and IECEx UL 20.0007X certificates

Отзывы: