background image

Parts List

A. Wire Basket Assembly
B. Sliding Base Assembly
C. (4) Mounting Screws

Tools Required

• Phillips Head Screwdriver
• Drill with 1/16˝(1.5mm) bit for

drilling pilot holes 

• Pencil

INSTALLATION INSTRUCTIONS

Undersink Basket

A

C

Step 1

Place sliding base assembly (B)
on cabinet floor, 1/2” to 3/4” from
front of cabinet. Close door to
make sure the unit will not hold
the door open. Fasten in place
using four (4) mounting screws
(C). 

Optional:
To avoid splitting wood you may
mark placement of mounting
holes with a pencil, remove unit
and drill pilot holes for fastening
screws.

Step 2

Slide basket into sliding base
assembly by inserting wheels on
basket into tracks on slide
bracket assembly. The basket
should move freely along the
track. Assembly and installation
are now complete. 

KNAPE & VOGT MANUFACTURING COMPANY

P.O. Box 191, Muncie, IN 47308

0.899.6536  •  765.288.8730  •  Fax 765.288.0851  •  www.kv.com

step 1

step 2

R N 2 0 0 E F     R E V : R E L / 1 1 0 2

©   2 0 0 2   K n a p e   &   V o g t   M a n u f a c t u r i n g   C o m p a n y .   A l l   r i g h t s   r e s e r v e d .

B

Отзывы: