RBR#0008819revA
–
15
3. Set the battery end cap off to the side.
4. Now you will have unobstructed access to the oil reservoir (red cap). To remove the reservoir turn the cap
counterclockwise at least one rotation and then pull.
5. The oil absorbent towel will be contaminated with the buffer (Dow Corning FS 1265 Fluid 300 cst) and should be
disposed of in accordance with local regulations.
6. Replace the O-ring on the waste reservoir.
7. Replace the absorbent towel by rolling one side of the towel and inserting it into the centre of the reservoir and
wrap the remaining towel around the reservoir in a clockwise manner (when viewed as below). The towel should only
wrap around the reservoir once, any additional layers will make it difficult to insert.
8. While holding the towel so that it does not unravel, reinsert the reservoir back into the instrument, and close by
turning the cap clockwise approximately one full rotation or until tight.
6.4.3 Repairs
We support all instruments and software that we manufacture. First line support is always available by phone or e-mail.
Please contact us immediately if you are experiencing problems with your RBR product. It is very important to contact
RBRquartz BPR|zero - service diagram
The complete RBR
quartz
3
BPR|zero service drawing is available in
Appendix B - RBRquartzBPR|zero Service
Содержание quartz3 BPR zero
Страница 1: ...rbr global com INSTRUMENT GUIDE BPR zero...
Страница 4: ...RBR 0008819revA 4 3 Revision history Revision No Release Date Notes A 04 May 2020 Original...
Страница 17: ...RBR 0008819revA 17 7 Appendix 7 1 Appendix A RBRquartzBPR zero Product Drawing...
Страница 18: ...RBR 0008819revA 18...
Страница 19: ...RBR 0008819revA 19 7 2 Appendix B RBRquartzBPR zero Service Drawing...
Страница 20: ...RBR 0008819revA 20 7 3 Appendix C RBRquartzBPR zero Connector Details...