•
Creation date: 06.01.2009
(Addendum VH: 09.12.2013)
rbr Messtechnik GmbH
Am Großen Teich 2
D-58640 Iserlohn
Tel. +49 (0)2371/945-5
Fax +49 (0)2371/40305
Internet www.rbr.de
E-Mail info@rbr.de
Service Guide
Страница 1: ...Creation date 06 01 2009 Addendum VH 09 12 2013 rbr Messtechnik GmbH Am Gro en Teich 2 D 58640 Iserlohn Tel 49 0 2371 945 5 Fax 49 0 2371 40305 Internet www rbr de E Mail info rbr de Service Guide...
Страница 2: ...49 0 2371 945 5 Fax 49 0 2371 40305 Internet www rbr de E Mail info rbr de Content 1 Transfer the Basic Software 3 2 Software Update DP 3 3 Change of printout 4 4 General Settings 4 5 Tightness Checki...
Страница 3: ...witch on Cyclone Pro and select file Switch on equipment and keep the button pushed down all the time Start transfer with the Cyclone Pro 2 Software Update DP Switch on the instrument Confirm Menu Con...
Страница 4: ...ransfer Data Transfer starts Control of the input only by the printout of a document 4 General Settings Settings under internal Button peep Yes Pressure automatic 0 to start Yes Ecom P Yes Charging th...
Страница 5: ...0305 Internet www rbr de E Mail info rbr de 5 Tightness Checking with the Test Device Connect complete system or just the DP Adapter unit Connect the left connection of the cross unit with the right c...
Страница 6: ...lue reacts very delayed Let value stabilise for 5 min Write down value and wait for 10 to 15 min Value must have dropped for 0 6 mbar maximum or Switch on instrument Go to point Prog in the menu and c...
Страница 7: ...test system Build up a pressure of app 200 hPa with the bellow Write down start pressure Leave it over night Write down the final pressure the next day Starting from a pressure of 200 hPa the final pr...
Страница 8: ...tion may not exceed 0 5 In case the value is more than this Press F2 Settings Confirm service Slide the magnet over the reed contact left side of instrument Confirm draught adjustment With the arrow k...
Страница 9: ...305 Internet www rbr de E Mail info rbr de Characteristics of the DP Japan Hodaka Sensor Calibration Switch off unit press and hold ON button approx 15 seconds press F2 select Service Hodaka address a...