Preliminary
9.5.5 HLT TV
Connect the high voltage from the CAPO to the shorten tertiary voltage terminals of the
transformer.
Connect the measurement Input A to the shorten high voltage terminals of the transformer.
Connect the measurement Input B to the shorten low voltage terminals of the transformer.
If you start the measurement, it will do the following 3 measurements:
GSTg B
C
T
+ C
HT
GSTg A+B
C
T
UST A
C
HT
90315-1.2 Instruction Manual CAPO
Page 83 of 117
Содержание CAPO 2.5
Страница 37: ...Preliminary 4 Thermal Printer 90315 1 2 Instruction Manual CAPO Page 37 of 117 ...
Страница 96: ...Appendix Page 96 of 117 CAPO 2 5 CAPO 12 90315 1 2 Instruction Manual CAPO CAPACITANCE AND POWER FACTOR METER ...
Страница 113: ...Preliminary I Warranty Conditions 90315 1 2 Instruction Manual CAPO Page 113 of 117 ...
Страница 117: ...Preliminary K Index Page 117 of 117 90315 1 2 Instruction Manual CAPO ...