Preliminary
3 CAPO 12
3.1 Unpacking
The Instrument
Power cord (dependent
upon country of
distribution)
2 Paper Rolls & 2 Fuses
HV Cable 1 x 10m
Measurement Cables
2 x 10m
Cable bag
Safety-GND Cable 1 x 10m
HV-GND Cable 1 x 10m
Safety-Switch 1 × 2m
Instruction Manual
USB Stick
If any of the above items are missing or damaged, contact your local representative or Raytech
Switzerland immediately.
Optional test leads may be ordered (other than shown).
90315-1.2 Instruction Manual CAPO
Page 14 of 117
Содержание CAPO 2.5
Страница 37: ...Preliminary 4 Thermal Printer 90315 1 2 Instruction Manual CAPO Page 37 of 117 ...
Страница 96: ...Appendix Page 96 of 117 CAPO 2 5 CAPO 12 90315 1 2 Instruction Manual CAPO CAPACITANCE AND POWER FACTOR METER ...
Страница 113: ...Preliminary I Warranty Conditions 90315 1 2 Instruction Manual CAPO Page 113 of 117 ...
Страница 117: ...Preliminary K Index Page 117 of 117 90315 1 2 Instruction Manual CAPO ...