27
Fig. 24
Fig. 23
NOTICE:
The following illustrations are simplified conceptual
illustrations only.
Legend for illustrations 23-24-25-26-27-28-29-30-31-32
Two pipes vent adaptors (included with the boiler)
Pos. 1
Mounting Clip (set of 4) 3.94” (100 mm) for coaxial
Pos. 2 (Fig. 24)
90° Elbow 3” (80 mm) single wall
Pos. 2 (Fig. 25-26-27-28)
Adaptor 80 mm > 3” (included with the boiler 1 pcs)
Pos. 2 (Fig. 29-30-31-32)
45° Elbow 3” (80 mm) single wall
Pos. 3 (Fig. 25-26-28)
Vertical vent termination 3.28 ft (1 m) 3.94” (100 mm) coaxial Pos. 3
Straight Pipe 1.64 ft (0.5 m) 3” (80 mm) single wall
Pos. 4 (FIg. 25-26-28)
Roof Flashing flat universal
Pos. 4 (Fig. 23)
Straight Pipe 3.28 ft (1 m) 3” (80 mm) single wall
Pos. 5
Straight Pipe 6.56 ft (2 m) 3” (80 mm) single wall
Pos. 6 (Fig. 28)
Roof Flashing sloping universal
Pos. 6 (Fig. 24)
45° Elbow 3.94” (100 mm) coaxial
Pos. 7
Horizontal inlet air vent 2.82 ft (0.86 m) 3” (80 mm) single wall
Pos. 8 (Fig. 25-26-27)
Straight Pipe 1.64 ft (0.5 m) 3.94” (100 mm) coaxial
Pos. 8 (Fig. 24)
Adaptor for room air dependent operation
Pos. 9 (Fig. 28)
Straight Pipe 3.28 ft (1 m) 3.94” (100 mm) coaxial
Pos. 9 (Fig. 24)
90° Elbow 3.94” (100 mm) coaxial
Pos. 10 (Fig. 24)
Mounting Clip (set of 4)
Pos. 10 (Fig. 25-26-27-28)
Vertical vent termination 3” (80 mm) single wall
Pos. 11
VERTICAL COAXIAL
SEALED COMBUSTION OPERATION
VERTICAL COAXIAL
SEALED COMBUSTION OPERATION
Содержание XPAK 120
Страница 1: ......
Страница 20: ...20 Fig 10 Fig 9...
Страница 21: ...21 Fig 11 Fig 12...
Страница 33: ...33 Fig 32 TWO PIPES SINGLE WALL SEALEDCOMBUSTIONOPERATION a total intake length 0 b total flue length EXHAUST...
Страница 38: ...38 WIRING FUNCTIONAL DIAGRAM Fig 40...
Страница 59: ...59 14 EXPLODED DIAGRAMS Drawing 1 5 7 9 3 12a 4 6 8 12a 1 10 2 11...
Страница 60: ...60 Drawing 2 17 18 56a 56a 14 15 56b 13 16 12b 19...