11
Chapter 2: Installation
Before starting to install your ST70+ products, read
Chapter , Getting Started
, so that:
•
You have all the necessary equipment to hand.
•
You know where you want to install the ST70+ products and where the appropri-
ate network connection points are.
2.1 Procedure
WARNING:
Before starting installation, ensure the boat is securely moored and
that electrical supplies are switched off.
With the boat at dockside, install each ST70+ display and keypad by carrying out the
procedures for:
•
Cabling.
•
Mounting & connecting
Cabling
Figure 2-1: Typical cabling at rear of displays and keypads
Display power cables
Ensure you have a suitable power supply for the displays (as described in
Chapter 1)
,
then run a power cable (supplied) from the intended location of each display, via a 5 A
fuse (or equivalent protective device) to the display power supply.
D11380-1
ST70+ display
ST70+ display
ST70+ keypad
To display
power supply via
5A fuse
Display power cable
Display power cable
SeaTalk
ng
backbone
SeaTalk
ng
spur
SeaTalk
ng
spur
SeaTalk
ng
spur
SeaTalk
ng
T piece
SeaTalk
ng
T piece
87099_1.book Page 11 Thursday, March 12, 2009 10:18 AM
Содержание ST70 Instrument
Страница 1: ...www raymarine com ST70 Document reference 87099 1 Date January 2009 Installation Guide ...
Страница 6: ...vi ...
Страница 10: ...x ST70 Installation Guide ...
Страница 20: ...10 ST70 User Reference Manual ...
Страница 28: ...18 ST70 User Reference Manual ...
Страница 64: ...54 ST70 User Reference Manual ...
Страница 70: ...60 ...
Страница 72: ...62 ...