3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning
any installation. It is also useful for any future
additions or maintenance of the system. The
diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
3.2 Pack contents
All models contain the following items:
1
2
3
4
5
6
7
8
D12098-1
Number
Description
1.
p70 / p70R Pilot controller (p70 8 button
controller is shown in diagram above.)
2.
Bezel
3.
Gasket
4.
Suncover
5.
4 x fixing screws
6.
Document pack
7.
SeaTalk
ng
Blanking plug
8.
SeaTalk
ng
Spur Cable
Unpack the pilot controller unit carefully to prevent
damage. Save the carton and packing in case the
unit has to be returned for service.
16
p70 / p70R
Содержание P70
Страница 2: ......
Страница 4: ......
Страница 10: ...10 p70 p70R ...
Страница 14: ...14 p70 p70R ...
Страница 28: ...28 p70 p70R ...
Страница 29: ...Chapter 5 Installation Chapter contents 5 1 Mounting on page 30 Installation 29 ...
Страница 38: ...38 p70 p70R ...
Страница 48: ...48 p70 p70R ...
Страница 58: ...58 p70 p70R ...
Страница 68: ...68 p70 p70R ...
Страница 74: ...74 p70 p70R ...
Страница 75: ...Chapter 11 Pilot controller alarms Chapter contents 11 1 Alarms on page 76 Pilot controller alarms 75 ...
Страница 80: ...80 p70 p70R ...
Страница 94: ...94 p70 p70R ...
Страница 110: ...110 p70 p70R ...
Страница 118: ...118 p70 p70R ...
Страница 121: ......