7.1 Installation checklist
Installation includes the following activities:
Installation Task
1.
Plan your system.
2. Obtain all required equipment and tools.
3.
Site all equipment.
4.
Route all cables.
5. Drill cable and mounting holes.
6. Make all connections into equipment.
7.
Secure all equipment in place.
8. Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any installation. It is also useful for any future
additions or maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
7.2 Tools required for installation
1
Power drill
2
4 mm (11/64) drill bit (for fixing studs)
3
22 mm (for cable hole when surface mounting)
4
Pozi-drive screwdriver (only required for Pole mount installations)
5
Size 4 (2.5 mm) Hex Key (only required for Pole mount installations)
30
Содержание MICRO-TALK
Страница 2: ......
Страница 4: ......
Страница 8: ...8...
Страница 12: ...12...
Страница 21: ...Chapter 4 Parts supplied Chapter contents 4 1 Parts supplied on page 22 Parts supplied 21...
Страница 23: ...Chapter 5 Product dimensions Chapter contents 5 1 Product dimensions on page 24 Product dimensions 23...
Страница 24: ...5 1 Product dimensions 24...
Страница 25: ...Chapter 6 Location requirements Chapter contents 6 1 Selecting a location on page 26 Location requirements 25...
Страница 40: ...40...
Страница 62: ...62...
Страница 68: ...68...
Страница 78: ...78...
Страница 80: ......
Страница 83: ......