6.1 Installation checklist
Installation includes the following activities:
Installation Task
1.
Plan your system.
2. Obtain all required equipment and tools.
3.
Site all equipment.
4.
Route all cables.
5. Drill cable and mounting holes.
6. Make all connections into equipment.
7.
Secure all equipment in place.
8. Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any installation. It is also useful for any future
additions or maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
40
Содержание Evolution EV-1
Страница 2: ......
Страница 4: ......
Страница 13: ...Chapter 2 Document information Chapter contents 2 1 Handbook information on page 14 Document information 13...
Страница 34: ...Item Description Quantity 4 Mounting screws 2 5 Document pack 1 34...
Страница 36: ...5 1 Dimensions EV 1 and EV 2 36...
Страница 37: ...5 2 Dimensions ACU 100 ACU 150 Product dimensions 37...
Страница 38: ...5 3 Dimensions ACU 200 ACU 300 ACU 400 38...
Страница 39: ...Chapter 6 Installation sequence Chapter contents 6 1 Installation checklist on page 40 Installation sequence 39...
Страница 54: ...54...
Страница 66: ...66...
Страница 80: ...Item Wire color ACU 100 ACU 150 1 Red 2 Blue 3 Green 4 Gray screen 80...
Страница 82: ...82...
Страница 104: ...104...
Страница 114: ...114...
Страница 115: ...Chapter 13 Operation Chapter contents 13 1 Evolution autopilot operation instructions on page 116 Operation 115...
Страница 128: ...128...
Страница 134: ...134...
Страница 138: ......
Страница 141: ......