
3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
12
i40
Содержание E70141
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 6: ...6 i40...
Страница 16: ...16 i40...
Страница 22: ...22 i40...
Страница 28: ...28 i40...
Страница 36: ...36 i40...
Страница 44: ...44 i40...
Страница 45: ...Chapter 8 Using alarms Chapter contents 8 1 Alarms on page 46 Using alarms 45...
Страница 58: ...58 i40...
Страница 59: ...Chapter 11 Technical support Chapter contents 11 1 Raymarine customer support on page 60 Technical support 59...
Страница 64: ...64 i40...
Страница 69: ......
Страница 70: ......