Implementation — connection to distribution panel
• Alternatively, the supplied power cable may be connected to a suitable breaker or switch on the
vessel's distribution panel or factory-fitted power distribution point.
• The distribution point should be fed from the vessel’s primary power source by 8 AWG (8.36 mm
2
)
cable.
• Ideally, all equipment should be wired to individual suitably-rated thermal breakers or fuses, with
appropriate circuit protection. Where this is not possible and more than 1 item of equipment shares
a breaker, use individual in-line fuses for each power circuit to provide the necessary protection.
1
Positive (+) bar
2
Negative (-) bar
3
Circuit breaker
4
Fuse
• In all cases, observe the recommended breaker / fuse ratings provided in the product’s
documentation.
39
Содержание Axiom Pro 12
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 12: ...12 ...
Страница 32: ...32 ...
Страница 50: ...50 ...
Страница 54: ...54 ...
Страница 76: ...76 ...
Страница 86: ......
Страница 87: ......
Страница 165: ......
Страница 170: ......
Страница 178: ...12 ...
Страница 214: ...48 ...
Страница 222: ...56 ...
Страница 228: ...62 ...
Страница 272: ...106 ...
Страница 296: ...130 ...
Страница 302: ...136 ...
Страница 310: ...144 ...
Страница 320: ...154 ...
Страница 344: ...178 ...
Страница 354: ......
Страница 358: ......
Страница 359: ......