![Raydec MT5 Скачать руководство пользователя страница 67](http://html.mh-extra.com/html/raydec/mt5/mt5_operating-manual_789705067.webp)
MT5 Multi-Tracer Operating Manual
page 67
8. Changing Module Grounding
Each MT5 module channel may be configured for either negative (most common) or
positive grounding. The Multi-tracer load provides the ground reference to the modules.
In order to switch the operation of the channel from one grounding reference to the
other, the module connector must be wired differently, see section 3.1.4
“Connections”,
and a simple change is required inside the Multi-Tracer load unit. This section describes
how to make the change inside the Multi-Tracer.
Before opening the Multi-Tracer load unit to make this change, turn off the AC power
switch, unplug all PV module connectors, and unplug the AC power cord.
This is important, both the AC power and PV modules present potentially
dangerous voltages that can harm or cause death.
To access the inside of the load unit, remove the top cover of the unit. There are four
screws (one in each corner). After removing these screws, remove the cover and two
trim strips, and set these aside.
On the inside, immediately opposite the module connector panel, there is a module
input circuit board. The input board(s) have a section for each module. These sections
are immediately behind the associated module connector.
Figure 35, show a typical module input board section configured for negative grounding.
Note: The fuse is located in the top position and the lower fuse position is empty. Also,
the internal load wire plug is in the topmost position. This plug has two positions, yet the
board has a three position connector.