51
The code of practice for the installation, commissioning & servicing of gas central heating
Installation, Commissioning and Service Record Log Book
NAME
ADDRESS
TEL No.
CUSTOMER DETAILS
IMPORTANT
COMPANY NAME
INSTALLATION DATE
ADDRESS
TEL No.
INSTALLER’S NAME
CORGI REGISTRATION DETAILS
REG No.
CORGI ID SERIAL No.
INSTALLER & COMMISSIONING ENGINEER DETAILS
NAME
COMMISSIONING DATE
ADDRESS
TEL No.
CORGI REGISTRATION DETAILS
REG No.
COMMISSIONING ENGINEER
(IF DIFFERENT)
CORGI ID SERIAL No.
LOCATION
%
MAKE AND MODEL
APPLIANCE SERIAL No.
SEDBUK No. %
LOCATION
BOILER
NEW SISTEM
or REPLACEMENT BOILER
For the central heating mode, measure and record:
HEAT INPUT
kW
BURNER OPERATING PRESSURE
mbar
CENTRAL HEATING FLOW TEMPERATURE
°C
CENTRAL HEATING RETURN TEMPERATURE
°C
HAS A WATER SCALE REDUCER BEEN FITTED?
YES NO
WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED?
FOR COMBINATION BOILERS ONLY
HAS THE SYSTEM BEEN FLUSHED IN ACCORDANCE
WITH THE BOILER MANUFACTURER’S INSTRUCTIONS?
WHAT WAS THE CLEANSER USED?
HAS AN INHIBITOR BEEN USED?
WHICH INHIBITOR WAS USED?
FOR ALL BOILERS
YES
NO
YES
NO
CONTROLS
To comply with the Building Regulations, each section must have a tick in one or other of the boxes.
REQUIREMENT
MEASURES PROVIDED
1. TIME AND TEMPERATURE CONTROL TO HEATING
ROOM STAT & PROGRAMMER/TIMER
PROGRAMMABLE ROOMSTAT
2. TIME AND TEMPERATURE CONTROL TO HOT WATER CYLINDER STAT & PROGRAMMER/TIMER
COMBI BOILER
3. HEATING ZONE VALVES
FITTED
NOT REQUIRED
4. THERMOSTATIC RADIATOR VALVES
FITTED
5. AUTOMATIC BYPASS TO SYSTEM
FITTED
NOT REQUIRED
6. BOILER INTERLOCK
PROVIDED
PLEASE FOLLOW THE INSTALLATION AND COMMISSIONING INSTRUCTIONS IN THE INSTALLATION MANUAL SUPPLIED WITH THE EQUIPMENT
The content of this Log Book has been produced in
consultation with
©
CENTRAL HEATING INFORMATION COUNCIL
INSTALLER DETAILS
1. Please keep the Log Book in a safe place for future reference.
2. This Log Book is to be completed in full by the competent person(s) who commissioned the boiler and associated equipment and then handed to
the customer. When this is done, the Log Book is a commissioning certifi cate that can be accepted as evidence of compliance with the appropriate
Building Regulations.
3. Failure to install and commission this appliance to the manufacturer’s instructions may invalidate the warranty.The above does not affect your statutory rights.
Benchmark is supported by
Содержание 780 Series
Страница 2: ......
Страница 7: ...7 Fig 3 OVERALL DIMENSION ...
Страница 34: ...34 Fig 45 Fig 44 Fig 46 ...
Страница 36: ...36 Fig 48 Fig 47 Fig 49 Fig 50 Fig 51 ...
Страница 42: ...Fig 59 42 SECTION 9 ELECTRICAL SYSTEM DIAGRAM ...
Страница 46: ...79 83 105 46 50 27 16 39 17 2 22 100 1 4 5 11 8 SECTION 11 ...
Страница 49: ...49 ...
Страница 50: ...COD 0017LIB06010 2 03 2010 ...