
Chapter 8
188
OmniSeed™ Viper Pro™ Installation & Operation Manual
Section Control Setup Screen
Touch within the Section Status area on the main screen to begin setting up the system.
The Section Control Setup screen will be displayed.
Turn-On/Turn Off Look-Ahead
Depending upon the type of valve used to control products, control valves may take several seconds to adjust
when opening or closing. To help compensate for the valve response time and lag due to filling or emptying
product supply lines, the look-ahead values allow the Viper Pro to begin adjusting control valves for map zones
and previously applied areas.
Note:
The look-ahead times should always be entered as positive values.
Turn-On Look-Ahead.
Enter the number of seconds ahead of the vehicle (based on vehicle speed) which the
Viper Pro will scan for zone boundaries and changes when turning product application on.
Turn-Off Look-Ahead.
Enter the number of seconds ahead of the vehicle (based on vehicle speed) which the
Viper Pro will scan for zone boundaries and changes when turning product application off.
Note:
The Section Control Aggressiveness factor uses the turn-on and turn-off look-ahead values to
adapt the responsiveness of the control valves for different driving styles and field conditions or
layout. To enable or disable the section control aggressiveness feature, touch the Next button on
the Section Control Setup screen until the Section Control Aggressiveness screen is displayed.
Содержание OmniSeed Viper Pro
Страница 1: ...Viper Pro Software Version 3 10 OmniSeed Calibration Operation Manual ...
Страница 10: ...Table of Contents viii OmniSeed Viper Pro Calibration Operation Manual ...
Страница 98: ...Chapter 4 86 OmniSeed Viper Pro Installation Operation Manual ...
Страница 150: ...Chapter 6 138 OmniSeed Viper Pro Installation Operation Manual ...
Страница 222: ...Chapter 10 210 OmniSeed Viper Pro Installation Operation Manual ...
Страница 240: ...Chapter 11 228 OmniSeed Viper Pro Installation Operation Manual ...
Страница 250: ...Appendix A 238 OmniSeed Viper Pro Installation Operation Manual FIGURE 1 OmniSeed System Diagram 3 Bin D N 054 5010 003 ...
Страница 251: ...Manual No 016 3001 015 Rev C 239 FIGURE 2 OmniSeed System Diagram 3 Bin D N 054 3001 026 ...
Страница 255: ...Manual No 016 3001 015 Rev C 243 FIGURE 6 Seed Blockage Sensor Cabling More than 60 Sensors D N 054 5002 002 ...
Страница 256: ...Appendix A 244 OmniSeed Viper Pro Installation Operation Manual ...
Страница 284: ...Appendix D 272 OmniSeed Viper Pro Installation Operation Manual ...
Страница 292: ...Appendix G 280 OmniSeed Viper Pro Installation Operation Manual ...
Страница 300: ...Appendix H 288 OmniSeed Viper Pro Installation Operation Manual ...
Страница 304: ...Index 292 OmniSeed Viper Pro Calibration Operation Manual ...
Страница 307: ......