CHAPTER
3
016-0171-724 Rev. A
7
CHAPTER 3
INSTALLATION AND
PREPARATION
RAVEN DEALER
1. Install and mount the chemical cabinet and the injection pump on the planter and install the plumbing parts
that interface the mixer and the point of injection to the carrier.
2. When the chemical box, carrier, and point of injection have been installed, please let the Syngenta
representative know the planter is ready for Direct Contact Inc. to complete the installation.
NOTE:
There are two plastic envelopes in the kit with plumbing parts.
One envelope is labeled “THESE PARTS TO BE INSTALLED BY RAVEN DEALER.” The dealer will install
these parts to interface the mixer and injection point to the carrier.
One envelope is labeled “THESE PARTS TO BE INSTALLED BY DIRECT CONTACT.” A representative
from Direct Contact will use the parts in this envelope to hook up the plumbing from the chemical
cabinet to the inlet of the injection pump and hook up the plumbing from the pump calibrator to the
point of injection. Direct Contact Inc. will provide the hose and the clamps for this part of the
installation.
FIGURE 1. Cabinet Mounted on Brackets
+26(127,1&/8'('
$9$,/$%/(.
Содержание Force Evo
Страница 1: ...Copyright 2019 Force Evo Injection System Installation Manual 016 0171 724 Rev A 12 20 E36393 ...
Страница 4: ...Table of Contents ii Force Evo Injection System Installation Manual ...
Страница 10: ...CHAPTER 2 6 Force Evo Injection System Installation Manual ...
Страница 22: ...CHAPTER 4 18 Force Evo Injection System Installation Manual ...
Страница 30: ...CHAPTER 5 26 Force Evo Injection System Installation Manual ...