Installation: Center Boom Sections
17
INSTALLATION
CENTER BOOM SECTIONS
Follow the best practices below for the most optimal installation:
• Remove all standard BEFVs and tube end threaded adapters.
• Remove sweeping tee feed points and tube end threaded adapters where indicated.
• For hose-to-hose barb connections, use two hose clamps that are oriented in opposite tightening directions to
secure the hose to the hose barb fitting (only one hose clamp is depicted in figures).
• Orient all fittings and hoses to avoid moving parts, pinch points, and hose kinks.
• Use the provided p-clamps, hose guard, and zip ties to secure the hose around fold joints and all boom tube
plumbing.
Содержание Case IH 50 Series
Страница 14: ...CHAPTER 2 10 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers...
Страница 31: ...Installation Boom Plumbing 27 INSTALLATION FIGURE 17 Inner Boom Plumbing Example for 7 Section 120 Boom...
Страница 33: ...Installation Boom Plumbing 29 INSTALLATION FIGURE 19 Mid Boom Plumbing Example for 7 Section 120 Boom...
Страница 54: ...CHAPTER 3 50 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers...
Страница 58: ...CHAPTER 4 54 Boom Recirculation Installation and Operation Manual for Case IH 50 Series Patriot Sprayers...
Страница 60: ......