
C
HAPTER
5
50
Viper Pro Installation & Operation Manual
MODEL YEAR 2010-2011 - 9X4(H), 11X4(H), 13X6 SERIES NODE AND
HARNESS INSTALLATION
INSTALL THE NODE AND NODE HARNESS
FIGURE 9. Node Mounting Location
1. Locate the node box on the right side of the machine and remove the cover.
FIGURE 10. Bulkhead Plug Location
2. Remove the bulkhead plug.
NOTE:
Keep the bulkhead washer and lock nut for use later in this procedure.
AUTOBOOM TIP
CONTROL
Connection
Bulkhead Plug
Содержание AutoBoom UltraGlide XT
Страница 39: ...3 Manual No 016 0171 122 Rev E 35 HYDRAULIC SYSTEM INSTALLATION HYDRAULIC SCHEMATIC ...
Страница 40: ...CHAPTER 3 36 Viper Pro Installation Operation Manual ...
Страница 64: ...CHAPTER 5 60 Viper Pro Installation Operation Manual WIRING DIAGRAM 2009 WIRING SCHEMATIC ...
Страница 65: ...5 Manual No 016 0171 122 Rev E 61 WIRING INSTALLATION 2010 2011 WIRING SCHEMATIC ...
Страница 66: ...CHAPTER 5 62 Viper Pro Installation Operation Manual 2012 NEWER WIRING SCHEMATIC ...
Страница 67: ...5 Manual No 016 0171 122 Rev E 63 WIRING INSTALLATION ...
Страница 68: ...CHAPTER 5 64 Viper Pro Installation Operation Manual ...