Instructions regarding the spreading operation
47
7
AXISAXIS
7
Instructions regarding the spreading operation
The intended use of the machine includes compliance with the operating, main-
tenance, and service conditions in accordance with the manufacturer specifica-
tions.
Spreading
therefore always includes
preparation
and
cleaning/maintenance
.
Carry out spreading operations in accordance with the sequence described
below.
Preparation
Installing the spreader on the tractor
Close metering slide
Presetting the mounting height
Filling in the fertiliser
Chapter A.2 or chapter A.3
1
1. See the register of your machine (AXIS 20.2, AXIS 30.2 or AXIS 50.2)
Adjusting the application rate
Chapter B.2
1
Setting the working width
-
Selection of the correct spreading disc
-
Adjusting the drop point
Chapter B.5
1
Chapter B.5.3
1
Spreading
Travel to the spreading location
Check the mounting height
Engage the PTO shaft
Open the slider and start spreading
Finish spreading operations, and close the
slides
Disengage the PTO shaft
Discharge residual material
Chapter B.10
1
Cleaning/maintenance
Open metering slide
Remove the spreader from the tractor
Cleaning and maintenance
Chapter C
1
and AXIS mainte-
nance
Содержание AXIS-M 20.2 EMC
Страница 4: ......
Страница 12: ...Table of Contents VIII ...
Страница 44: ...Safety 3 24 AXIS AXIS ...
Страница 51: ...Technical data 31 4 AXIS AXIS 4 2 4 Agitator Figure 4 6 Agitator 1 Metering slide 2 Agitator ...
Страница 64: ...Axle load calculation 5 44 AXIS AXIS ...
Страница 66: ...Transportation without tractor 6 46 AXIS AXIS ...
Страница 68: ...Instructions regarding the spreading operation 7 48 AXIS AXIS ...
Страница 110: ...General commissioning all machine types 8 90 AXIS AXIS ...
Страница 144: ...Maintenance and repair C 124 AXIS AXIS 20 2 ...
Страница 178: ...Maintenance and repair C 158 AXIS AXIS 30 1 AXIS 40 1 ...
Страница 214: ...Maintenance and repair C 194 AXIS AXIS 50 2 ...
Страница 236: ......