Maintenance and repair
111
9
9.11
Checking the drop point
By altering the drop point, the working width can be accurately set and adjust-
ments to different fertiliser types can be made.
Check the setting of the drop point at the start of each working season, and during
the season if necessary (in case of uneven fertiliser spreading distribution).
Figure 9.16:
Checking the drop point
[1] Left/right adjustment centre
[2] Left/right outer yoke
[3] Left/right inner yoke
[4] Actuator
[5] Setting unit
[6] Control lever
1.
Set the drop point with the ISOBUS machine control unit to
position 6
.
2.
Switch off the electronic system.
NOTICE
Normally, the drop point must be set to the
same
position on both sides. During
full and limited border spreading, the working width and spreading disc speed
can be adjusted on one or both sides by means of the drop point. Therefore, al-
ways check both settings.
Содержание AXIS H EMC Series
Страница 28: ...Safety 3 22...
Страница 35: ...Technical data 29 4 Figure 4 6 Hydraulic motor for spreading disc drive 1 Hydraulic motor...
Страница 46: ...Axle load calculation 5 40...
Страница 48: ...Transportation without tractor 6 42...
Страница 100: ...Spreading operation 8 94...
Страница 132: ......