10 | iProductionManager
Original instructions for use
61 / 112
3. Enter a name.
4. To confirm, press this button:
>>
The plan will be added to your list of plans.
10.7.2
Starting plans
a
Use this feature after creating plans [
a
Make sure that the iProductionManager is not currently running a ticket. If tickets are in progress, a message
will be displayed to notify you that all tickets will need to be canceled before the plan can be run.
1. Press this button:
2. Press the plan you want to run.
>>
The plan will start immediately. Tickets will be placed on levels in accordance with the plan. The tickets on the
ticket board will be replaced with the ones in the plan.
Содержание iCombi Pro
Страница 1: ...iCombi Pro Original instructions for use...