background image

 

 

 

 

 

ApplianceStor 174R 

ApplianceStor 175R 

Performance Storage Server 

User Manual 

 

 

 
   
November 2020 
 
 
 

RASILIENT  CONFIDENTIAL  PROPRIETARY  INFORMATION  This  document 
contains  confidential  information  that  is  proprietary  to  Rasilient  or  confidential 
information  which  Rasilient  has  a  legal  duty  to  protect  from  disclosure.  The 
information  contained  in  this  document  may  not  be  disclosed  without  the  express 
written permission of Rasilient Systems Inc. 

Содержание ApplianceStor 174R

Страница 1: ...PRIETARY INFORMATION This document contains confidential information that is proprietary to Rasilient or confidential information which Rasilient has a legal duty to protect from disclosure The information contained in this document may not be disclosed without the express written permission of Rasilient Systems Inc ...

Страница 2: ... herein Nothing herein may be construed as granting any right or license relating to any intellectual property rights of this manual or product Unless otherwise provided in the Purchase and Sale Agreement for this product manufacturer and distributor of this product will not be liable whatsoever relating to the distribution and or use of this product In addition manufacturer and distributor of thi...

Страница 3: ...ct EMC Compliance 6 European Union Notice 7 Power Cords 8 Introduction 10 Audience Assumptions 10 About this Guide 10 Packing Checklist 10 Specifications 11 Product Features 12 System Overview 12 Powerful 12 Purpose built 12 Effortless installation 12 Front View 13 Back View 14 System LED Information 14 Hardware Installation 18 Hard Disk Drives 18 Power Supply Modules 20 Mounting the System onto a...

Страница 4: ...2 AS175 Front Panel 13 Figure 3 AS175 Rear View and Panel 14 Figure 4 Front Panel LEDs 15 Figure 5 HDD Status LEDs 16 Figure 6 HDD Installation 18 Figure 7 AS175 Power Supply Insert removal 20 Figure 8 Rail Kit Package 21 Figure 9 Rail Kit dimensions 24 ...

Страница 5: ...List of Tables Table 1 Safety Compliance 6 Table 2 European Union Compliance 7 Table 3 Introduction of the Manual 10 Table 4 Package Contents 10 Table 5 Specifications 11 ...

Страница 6: ...1 About This Manual Conventions Safety Symbols Safety Precautions Regulatory and Integration Information ...

Страница 7: ... used throughout this manual Warning Provides Information to prevent injury in the process of completing a task Caution Provides Information to prevent damage to the components in the process of completing a task Important Provides Information required for completing a task Note Provides Tips to aid in completing a task ...

Страница 8: ... RJ45 marked with this symbol indicates a network interface connection To reduce the risk of electric shock fire or damage to equipment do not plug telephone or telecommunications connectors into this receptacle WARNING This symbol on power supplies or systems indicates that the equipment is supplied by multiple sources of power To reduce the risk of injury from electric shock remove all power cor...

Страница 9: ...to the work surface as well as properly grounded tools and equipment Keep the area free of nonconductive materials such as ordinary plastic tools and foam packing Avoid touching pins leads or circuitry Always place drives with printed circuit board PCB assembly side down Grasp cards and boards by the edges Hold drives by the frame Avoid touching the solder joints or pins If you need to lay the dev...

Страница 10: ...es and other system modules to cool before touching them To reduce the risk of electric shock or damage to the equipment do not disable the power cord grounding plug The grounding plug is an important safety feature Ensure the power cord is inserted into a grounded electrical outlet that is easily accessible at all times Unplug the power cord from the power supply module to shut off power to the e...

Страница 11: ...roduct has been tested and verified to comply with the following electromagnetic compatibility EMC regulations FCC CFR Title 47 Part 15 Subpart B 2019 Class A CISPR 22 2008 ANSI C63 4 2014 ICES 003 Issue 6 2016 Class A Communications Commission Notice Part 15 of the Federal Communications Commission FCC Rules and Regulations has established Radio Frequency RF emission limits to provide an interfer...

Страница 12: ... correct the interference at personal expense Declaration of Conformity for Products Marked with the FCC Logo United States Only This device complies with Part 15 of the FCC Rules Operation and is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation ...

Страница 13: ...ical ratings label The voltage and current rating of the cord should be greater than the voltage and current rating marked on the product In addition the cross sectional area of the wires must be a minimum of 1 00mm or 18AWG and the length of the cords must be between 1 8m 6 feet and 3 6m 12 feet If you have questions about the type of power cord to use contact your sales representative The follow...

Страница 14: ...9 Audience Assumptions About This Guide Packing Checklist Specifications Product Features System Overview Chapter 1 Introduction ...

Страница 15: ...ntroduction General introduction to the AS175 and its components Hardware Installation Detailed description of each hardware module and instructions for installation and removal Packing Checklist Make sure you have all the components shipped with your system If any item is damaged or missing please contact your sales representative for replacement The AS175 is shipped with the following Table 4 Pa...

Страница 16: ...system can only be fitted with 1 GPU or RAID adapter at a time Storage 2x 240 480 960 GB SSD for OS 4x 3 5 HDD not available w GPU 6 8 10 12 14 and 16TB SATA III Video Class Networking 4x GbE 1x Management Display Output 1x VGA if GPU is installed 1x mDP 2x HDMI Input Output 4x USB 3 0 2x front 2x rear Dimensions WxHxD 17 5 x 1 7 x 24 3 444 x 44 x 616 mm Weight Max 42 lbs 19 kg Power 2x 100 220V A...

Страница 17: ...ul Server and storage system built around dual high performance Intel Xeon Scalable processors Purpose built Open platform to integrate Video Management Software and Video Analytic Software Providers All major supported Video Analytic Software providers are prequalified More are continually added to ensure the widest possible certification coverage Effortless installation Management and administra...

Страница 18: ... to the 4 hot plug drive canisters Each drive canister has a status LED located to the right of the release handle The power and reset buttons LED indicators slim type optical drive and two USB ports are located on the front panel Figure 2 AS175 Front Panel ...

Страница 19: ... middle part includes the I O shield with openings for the rear panel connectors on the motherboard Figure 3 AS175 Rear View and Panel System LED Information This system is equipped with LED indicators for all major components of the system These LEDs provide visual cues to the status of each of these components ...

Страница 20: ...15 Front panel LEDs Figure 4 Front Panel LEDs LAN Port RJ 45 LEDs ...

Страница 21: ...16 Dedicated Management LAN port DM_LAN1 LED indications HDD status LED Figure 5 HDD Status LEDs ...

Страница 22: ...17 Hard Disk Drives Mounting the System onto a Rack Chapter 2 Hardware Installation ...

Страница 23: ...e installed on the drive tray connects to the motherboard SATA SAS ports via the SATA SAS backplane To install a 3 5 hot swap SATA SAS HDD Push the spring lock to the right A then pull the tray lever outward B to release the drive tray The drive tray ejects slightly after you pull out the lever Figure 6 HDD Installation ...

Страница 24: ...19 To remove a 3 5 hot swap SATA SAS HDD Firmly hold the tray lever and pull the drive tray out of the bay ...

Страница 25: ...oaded system The second power supply serves as a backup in the event of a system failure The location of the power supply modules on the AS175 is shown below To remove a power supply follow the figure below To insert the power supply reverse the steps Figure 7 AS175 Power Supply Insert removal Reminder Before you remove or install the power supply module from the AS175 disconnect the power supply ...

Страница 26: ...tional tools The kit also comes with a metal stopping bracket that can be installed to provide additional support and stability to the server The tool less rail kit package includes Figure 8 Rail Kit Package Installing the tool less rack rail To install the tool less rack rails into the rack 1 Secure the two fixing latches to the two sides of the server using the set of latch screws ...

Страница 27: ...Slightly slide out and extend the right rack rail then prepare one of the bundled rail components 3 Align the rail component with the right rack rail and secure it using four 4 bundled screws 4 Follow steps 2 and 3 to secure the rail component to the left rail rack 5 Select a desired space and place the appropriate rack rail left and right on opposite positions on the rack ...

Страница 28: ...quare mounting holes on the rack post 8 Press the spring lock on the other end of rail then insert the stud into the mounting hole on the rack post Extend the rack rail if necessary 9 Optional Use the rail screw and rail washer that comes with the kit to secure the rack rail to the rack post 10 Perform steps 3 to 5 for the other rack rail Ensure that the installed rack rails left and right are ali...

Страница 29: ... Lift the server chassis and insert into the rack rail Ensure that the rack rail cabinet and the rack posts are stable and standing firmly on a level surface Rail kit dimensions Figure 9 Rail Kit dimensions ...

Отзывы: