![Rapid 7500 136 Скачать руководство пользователя страница 120](http://html1.mh-extra.com/html/rapid/7500-136/7500-136_installation-operation-and-service-manual_3682752120.webp)
7500-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
108 of 143
FIGURE
8
6: Belt Tension
Table 17: Deflection Force of V-Belts
NOTE: If drive belts squeal during start-up, increase belt tension
to the highest allowed value. Re-check tension during each
inspection.
16.2 Electrical
1. Check motor starter for proper o
v
erload set-
tings. The o
v
erload setting m
u
st eq
u
al the f
u
ll
load amps (FLA) of motor.
2.
Meas
u
re the s
u
pply
v
oltage
w
ith the air t
u
rn-
o
v
er
u
nit off and then on. For a system that is
po
w
ered
w
ith three phase po
w
er, meas
u
re the
v
oltage of each phase.
3.
Verify correct fan rotation.
4.
While the fan(s) is r
u
nning and the
bu
rner is
off, meas
u
re the total system c
u
rrent dra
w
w
ith
an ammeter. Meas
u
re the system c
u
rrent dra
w
again after the
bu
rner adj
u
stments are made
and
w
ith the
bu
rner and
b
lo
w
er
b
oth on.
16.3 Airflow
Factory cali
b
rated, the air flo
w
s
w
itches are safety
de
v
ices for
bu
rner air flo
w
. If an air flo
w
s
w
itch does
not close, the pro
b
lem may not
b
e the air flo
w
s
w
itch.
It co
u
ld
b
e an indication of an air flo
w
pro
b
lem
(incorrect fan rotation, etc.)
16.4 General Start-up Procedures (All Fuels)
A thoro
u
ghly q
u
alified
bu
rner technician sho
u
ld
b
e
employed to pro
v
ide the initial
bu
rner start
u
p. Before
b
eginning start
u
p, the technician sho
u
ld thoro
u
ghly
st
u
dy and
b
ecome familiar
w
ith the exact seq
u
ence
of operation and all other details of the specific flame
safeg
u
ard control system
b
eing
u
sed. Beca
u
se of the
v
ario
u
s flame safeg
u
ard controls
b
eing
u
tilized, a
separate man
u
fact
u
rer's
bu
lletin is s
u
pplied
w
ith the
air t
u
rno
v
er
u
nit.
Complete and/or re
v
ie
w
all preca
u
tions and
inspection proced
u
res in pre
v
io
u
s sections and
bu
rner man
u
fact
u
rers' literat
u
re.
Close main and man
u
al
bu
rner sh
u
t-off
v
al
v
es. Open
oil s
u
ction line man
u
al
v
al
v
es and others as
appropriate.
Tighten all scre
w
s on terminal
b
locks in control
ca
b
inet in case some may ha
v
e loosened d
u
ring
transit.
Check
v
ent stack to ens
u
re it is open and
u
no
b
str
u
cted.
Check rotation of main s
u
pply motor(s) and
bu
rner
b
lo
w
er
b
y momentarily making contact of the motor
contractors/starters. Proper rotation is imprinted on
the air t
u
rno
v
er
u
nit for the s
u
pply fan(s) and on the
fan(s) ho
u
sing for the
bu
rner.
Check operating controls, limit controls, flame
safeg
u
ard control reset, high and lo
w
gas and/or oil
press
u
re s
w
itches (if
u
sed) and lo
w
fire interlocks (if
u
sed) and all other applica
b
le interlocks. All contacts
sho
u
ld
b
e closed (an exception
w
o
u
ld
b
e the lo
w
gas
and/or oil press
u
re s
w
itch.
16.5 Fan Start-Up
Place main disconnect s
w
itch in the on position and
the fan selector s
w
itch in the man
u
al position and the
S
u
mmer/Off/Winter s
w
itch in the s
u
mmer position.
With the main s
u
pply fan motor r
u
nning take and
record its amp dra
w
, ret
u
rn the selector to the off
position.
16.6 Burner Start-Up
The standard
bu
rners are man
u
fact
u
red
b
y Po
w
er
Flame Incorporated
®
. The follo
w
ing start
u
p
information pertains to these
bu
rners. If a different
man
u
fact
u
rer's
bu
rner is
u
tilized, refer to the separate
man
u
fact
u
rer's literat
u
re incl
u
ded
w
ith the
doc
u
mentation shipped
w
ith the air t
u
rno
v
er
u
nit.
To help pre
v
ent
u
n
bu
rned f
u
el in the heat exchanger,
Belt
Cross-
Section
Motor Sheave
Dimension Ran
g
e
(inches) - (cm)
TYPE B
TYPE B-X
(Hi
g
h H.P.)
Min.
Max.
Min.
Max.
B
3.4 - 4.2
4
5 1/2
5 3/4
8
4.4 - 5.6
5 1/8
7 1/8
6 1/2
9 1/8
5.8 - 8.6
6 3/8
8 3/4
7 3/8
10 1/8
Belt Span
Содержание 7500 136
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 33: ...SECTION 6 LIFTING AN AIR TURNOVER UNIT 21 of 143 FIGURE 10 Lifting an Air Turnover Unit Base Section...
Страница 36: ...7500 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 24 of 143 FIGURE 12 Air Turnover Unit Sections Schematic...
Страница 67: ...SECTION14 ELECTRICAL 55 of 143 FIGURE 38 Wiring Diagram Key...
Страница 115: ...SECTION 15 SEQUENCE OF OPERATION 103 of 143 FIGURE 83 Wiring Subbase and Sequence Chart for RM7897 Burner Control Module...
Страница 156: ......